October 11, 2026 | by Frank, SunAura Machinery Project Engineering
QINGDAO, China — SunAura Machinery has shipped a complete automatic shrink wrapping and bundling line for a Polish dairy producer based near Warsaw. The line, which left our Qingdao port last week, will bundle 1-liter UHT milk cartons into 12-pack shrink-wrapped trays for distribution to retail customers across Poland and Germany.

For the other end-of-line stabilization method — strapping instead of shrink bundling — SunAura also delivered an automatic strapping line for a corrugated box producer, combining bundle strapping with pallet load strapping for export shipments.
The Customer and Project
The Polish dairy — a mid-size producer with its own UHT bottling line — was previously bundling cartons manually. With rising labor costs in Poland and growing demand from German discount retailers (Biedronka, Lidl, Netto) requiring standardized 12-pack bundles, the customer needed an automatic shrink bundler that could integrate with their existing bottling line.
After evaluating offers from three European packaging machinery suppliers, the Polish dairy chose SunAura on total cost. The European quotes were 2.5× our price for equivalent throughput, and the customer’s engineering team was impressed by the reference visits we arranged — including a video call with our existing customer in the Czech Republic running a similar shrink bundling line.
Line Configuration
| Station | Equipment | Specifications |
|---|---|---|
| 1 | Carton accumulation conveyor | 4 meter mass accumulation, buffer for 30 seconds of production |
| 2 | Automatic tray former | 50 trays/min, for paperboard pads under milk cartons |
| 3 | Side-seal shrink wrapper | Up to 30 bundles/min, 12 cartons per bundle |
| 4 | Shrink tunnel | 2.4 meter, PID temperature control, 3 zones |
| 5 | Output conveyor to palletizer | 3 meter, feeds into existing palletizer |
Why Poland Matters

Poland is one of the fastest-growing food processing markets in the EU. Polish dairy, meat and snack producers are modernizing their packaging lines to meet German retail standards, and they’re increasingly open to Chinese-built equipment that offers EU-level quality at a lower price. The Warsaw project is our second Polish dairy line this year — the first was a cheese vacuum packaging line shipped in June.
European buyers, like the Polish dairy, have specific requirements that we’ve built into our export models: CE-certified electrical panels, 400V three-phase power, English (and on request Polish/Hungarian/Czech) documentation, and compliance with EU Machinery Directive 2006/42/EC. Our certifications page lists the current CE and TUV documentation available for each machine category.
Installation and Commissioning
Because the line is relatively compact (the shrink wrapper and tunnel are a single connected unit), installation at the Warsaw site is expected to take three days. Our lead service engineer will travel to Poland for installation supervision and operator training. The Polish dairy already has a maintenance team familiar with European packaging equipment, so the training focus will be on SunAura-specific HMI operation and our recommended maintenance schedule.
Spare parts for the Polish line are being shipped with the container — a recommended spare parts kit including sealing brushes, tunnel belts, and heater elements — so the customer has critical wear parts on hand from day one. This follows our spare parts strategy for EU customers.
Based in Central/Eastern Europe and evaluating shrink wrapping or bundling equipment? Send your product, bundle configuration and throughput requirements through the contact page. We’ll provide a CE-compliant quotation and connect you with existing customers in Poland, Czech Republic and Hungary for reference calls. Browse our shrink wrapping range and integrated packaging lines for more configurations.
The Polish dairy line is the first of two EU projects shipping in October. A second shrink bundling line for a German bakery is scheduled for production start in November. More details on both projects will be posted to the news section after commissioning.
