Built in-house. Operated standalone or integrated into one synchronized turnkey line — the same way Hannover Messe groups exhibitors by topic.

Piston, overflow, gravity and flow-metric fillers.
View ›
Spindle, chuck, press and rotary cappers.
View ›
Horizontal pillow wrappers for snacks, bars, soap.
View ›
10–14 head combination scales for snacks & frozen food.
View ›
Form-fill-seal and skin packaging lines for trays & MAP.
View ›
Online foil liners — tamper-evident, FDA-ready.
View ›
Filling, capping, weighing, wrapping — one PLC, one PM.
Design My Line ›Hygienic, compliant front-end lines engineered around your viscosity, dosing and cleanroom requirements.

Liquid fillers, sauce pumps, snack weighers and tray sealers for dairy, beverages, snacks and ready meals.

Cream fillers, tube sealers, bottle cappers and flow wrappers for lotions, serums, soap and cosmetics.

Oral liquid fillers, vial crimpers, induction sealers, electrolyte filling lines and explosion-proof chemical fillers.
18+ years of vertical integration, one engineering team from first drawing to after-sales.
Machinery & EMC Directive
Quality Management System
Low Voltage & Machinery
Third-Party Verification
Tell us your product, container and target output. Our engineers reply within 24 hours with a tailored line proposal and quotation.
Request a Free Quote
Yes. Most wrapp [&hellip
No. Aluminum ca
The commissione
The commissione
Usually no. X-r
Engineering guides on filling principles, weigher integration, flow-wrapper sealing and line economics — written for buyers, not vendors.
Browse All GuidesVertical integration from steel cutting to factory acceptance test. No subcontractors in the critical path — one engineering team owns the line from first drawing to after-sales.
72-hour Factory Acceptance Test on every turnkey line before shipment — running your product, your containers, your target speed. You watch remotely or fly in.
In-house machining, sheet metal, welding, electrical assembly and commissioning under one roof in Qingdao, China.
Machinery Directive, EMC, ISO 9001 QMS and UDEM low-voltage certification. SGS third-party audit on request.
18+ years manufacturing, machines running in 100+ countries across food, cosmetic, pharmaceutical, chemical and new-energy plants.
The same six machine families our engineers specify on every turnkey project. Pick one standalone, or combine them into a single synchronized line.

Piston, overflow, gravity and flow-meter fillers for liquids, sauces, creams and chemicals. ±0.5% dosing accuracy.
View Details ›
Spindle, chuck, press-on and rotary cappers with torque control for screw, ROPP and snap closures.
View Details ›
10–18 head combination scales for snacks, frozen food, nuts and granules. 0.1 g target accuracy on premium SKUs.
View Details ›
Roll-stock form-fill-seal and skin packaging for trays, MAP and vacuum skin. PP / PET / PLA compatible.
View Details ›
Online aluminum-foil liner sealing for jars and bottles — tamper-evident, leak-proof, FDA-ready.
View Details ›
Wrap-around, front-back and pressure-sensitive labelers for round, flat and tapered containers.
View Details ›From bulk container to sealed, labeled and coded pack. We integrate filler, capper, weigher, labeler, sealer and conveyor into a single synchronized front-end line.
Piston / flow-meter dosing into bottles, jars or cups.
Spindle or rotary capper with torque-controlled closure.
Multihead combination scale for bulk or pre-mixed products.
Wrap-around or front-back pressure-sensitive labels.
Roll-stock forming, filling and sealing for trays.
Induction foil liner or film seal for tamper evidence.
Representative commissions from the last 24 months. Client names withheld under NDA; industry and region are accurate.

New 12-head rotary platform for viscous sauces — target ±0.5% dosing on glass jars at high volume.
Read Project →
Roll-stock tray line with MAP gas flush, shipped and commissioned in central Europe.
Read Project →
Inline foil liner sealing for glass jars — tamper-evident, no water-cooling infrastructure required.
Read Project →
Complete bottled-water front-end line delivered to a Southeast Asian producer — filler, capper, labeler on one PLC.
Read Project →53 in-depth technical guides written for packaging engineers — not sales collateral. Start with the six below.
A side-by-side engineering comparison to pick the right filler principle for your product.
Dosing accuracy, CIP, changeover and viscosity limits — the buyer's checklist.
How many heads you actually need, and how to balance weigher discharge with downstream bagging.
Roll-stock vs pre-made tray, MAP vs vacuum, servo vs mechanical — the decision framework.
Torque specs, closure types and changeover parts — what to ask your supplier for.
Foil liner chemistry, head cooling, power tuning and reject verification.
We build the core machines in-house. Where a specialist component adds measurable value, we integrate proven third-party subsystems and qualify them as part of our FAT.
Industrial PLC platforms with Ethernet/IP, recipe storage and remote diagnostics.
High-precision strain-gauge load cells for combination scales and checkweighing.
Belt, slat and modular belt conveyors with accumulation, side guides and turning stations.
AC servo axes for dosing pumps, film feed, seal jaws and capping torque control.
Short, engineering-direct answers to the questions we hear most often on the first call.
The FAT is a 72-hour run-off of the completed line at our Qingdao factory before shipment, using your actual product, containers and target speed. It catches integration issues on our bench, not your floor — and you can watch remotely or fly in. Every SunAura turnkey line ships after a documented FAT with signed sign-off.
A standard filling-capping-labeling line typically takes 8–12 weeks from order confirmation to FAT. Custom thermoforming or high-speed multi-head lines run 14–20 weeks. We share a Gantt chart at order kickoff and update it weekly.
Yes. We routinely integrate third-party weighers, labelers and coding systems into SunAura-framed lines. The condition is that the subsystem exposes a standard industrial communications interface — we qualify it during engineering review and include it in the FAT.
CE marking (Machinery Directive and EMC), ISO 9001 quality management, and UDEM low-voltage certification. SGS third-party inspection is available on request. Documentation (CE declaration, wiring diagrams, O&M manual) ships with every machine.
Every line ships with a recommended spare-parts list. Critical wear parts are stocked at our Qingdao warehouse and dispatched within 48 hours under our global spare-parts shipping program. Remote diagnostics via the line's PLC and HMI are standard.
Product name and viscosity, container type and size, target output (units per hour), current or target line footprint, utility supply (power, air, water), and any regulatory requirements (food-grade, pharma GMP, ATEX). With those six data points, we can send a first-pass proposal within 24 hours.
Send us your product, container and target output. Our engineers reply within 24 hours with a line proposal, layout and quotation — no obligation.