
YC600W Servo Reciprocating Packaging Machine
The Servo reciprocating flow wrapper is specified against the real constraints of the job — pack size, target rate and the room it runs in — rather than against a single headline number.
| Output | 40 – 230 packs/min |
|---|---|
| Lane | Single lane, multi-servo |
| Accuracy | cut-off within ± 1 mm of mark |
| Price band (FOB) | US$ 8,000 – 35,000 |
| Lead time | 25 – 45 days |
1. Who this machine is for, and who should not buy it
This machine is bought by buyers who have already narrowed the process to Pillow / flow wrapping and now need the configuration that matches their actual pack range and rate, rather than the largest frame in the catalogue.
It is the wrong choice when the pack dimensions or rate fall outside the stated range, when consumables cannot be supplied locally, and when the volume is low enough that a manual or smaller station remains cheaper.
The realistic buyer can state the largest and smallest pack, a target output and the working environment, and wants a machine that holds those numbers across a shift rather than in a short demonstration.
2. How it works
A multi-servo box-motion machine where the sealing jaws reciprocate, allowing long products and high speed without stopping the film.
The same cycle repeats on every pack and the consistency of the result is decided by the feed, the timing and the condition of the wear parts rather than by operator technique.
Changeover between formats is part of the normal operation: settings are recalled and the guide parts are changed, and the time this takes is a cost that should be counted against the number of formats run in a week.
3. Configuration matrix: what changes and what it costs you
The same base frame is sold in several configurations, and the differences matter more than the marketing names suggest. The table below maps each configuration to the buyer profile it actually fits, so you can rule out options before they appear in a quotation.
| Configuration | Lane | Typical output | Container range | Best for | Trade-off |
|---|---|---|---|---|---|
| Single-film basic | 1 lane | 40 – 90 packs/min | Short products | Entry level, single SKU | Manual adjustment |
| Yc420 upper-film | Dual servo | 60 – 150 packs/min | Food, hardware | General mid-volume | Film from above |
| Yc420X three-servo | Three servo | 80 – 180 packs/min | Registered film | Multi-SKU, fast change | Recipe control |
| Yc600W reciprocating | Box-motion jaws | 100 – 230 packs/min | Long products | High-speed lines | Larger footprint |
| Gas-flush option | MAP injection | Slightly lower rate | Fresh bakery, meat | Modified atmosphere | Gas supply, cost |
The configurations share a base frame but are not interchangeable after delivery, so pick by the pack range and rate you can prove rather than by the name on the brochure.
4. Technical specifications
Figures below are the standard build. Every value can be changed, but each change moves price, lead time and the commissioning effort, so read the notes column before asking for a variant.
| Parameter | Standard | Optional / range | Why it matters |
|---|---|---|---|
| Film feed | Upper / lower | Per model | Decides format |
| Film width | Up to 450 mm | Per model | Limits product width |
| Bag length | 60 – 500 mm | Registered | Long products need box motion |
| Rate | 40 – 230 packs/min | Product dependent | Pitch and jaw timing |
| Seals | Fin + cross | Fin or lap option | Different seal appearance |
| Drives | 1 – 4 servos | Three servo standard | Servo count sets flexibility |
| Registration | Photo-eye | Registered film | Aligns printed film |
| Film type | BOPP / laminate | Cold-seal option | Material sets temperature |
| Power | 2.5 – 5 kW | 380 V three-phase | Separate circuit |
| Frame | Painted / stainless | Stainless option | Food rooms |
5. Throughput and capacity planning
The headline rate is measured on the most favourable pack and falls as the size grows. Always quote at your own dimensions rather than the published maximum.
Plan on roughly 70 to 80 percent of the quoted rate across a shift once feeding, changeover and brief stops are included; sizing to the middle of the range leaves mechanical headroom.
The upstream and downstream stations must accept the same rate, because a machine that outruns the rest of the line creates queues and then idle time.
| Shift pattern | Gross output | OEE at 65% | Annual bottles (300 days) |
|---|---|---|---|
| 1 × 8 h | 230 bph | 150 bph | 358,800 |
| 2 × 8 h | 230 bph | 150 bph | 717,600 |
| 3 × 8 h | 230 bph | 150 bph | 1,076,400 |
Size the machine on the middle of the range, not the top. A unit sold at 230 bottles per hour that runs at 230 for six hours a day is being asked to live at its mechanical limit; the same unit at 173 bottles per hour has headroom for viscosity drift, cap changes and the occasional slow batch.
6. Product and container fit
Fit is decided by the physical dimensions and condition of the pack, which the machine can only accept within the range it was built for.
A pack at the edge of the range is the source of most problems: it runs slowly, wears the guides and is the first to reject, so name the extremes rather than the average.
| Product type | Viscosity band | Fit | What to watch |
|---|---|---|---|
| Bakery / biscuits | Dry | Excellent | Most common food use |
| Fresh produce | Variable | Good with gas | Soft feed needed |
| Hardware / single items | Rigid | Good | Protect edges, guide |
| Long / tray products | Extended | Box-motion only | Reciprocating jaws |
| Wet / sticky items | Moist | Conditional | Stainless, non-stick parts |
| Multi-packs | Grouped | Conditional | Lug timing, collation |
7. Selection decision framework
Use these rules in order. Each one is a hard filter, not a preference, and each is written so that two buyers with different constraints reach different answers rather than the same recommendation.
Rule 1: Product dimensions first
Product width and length set the film width and whether box-motion jaws are needed for long items.
Rule 2: Speed second
Under 90 packs/min a basic frame is enough; above 180 only a three-servo or reciprocating machine keeps up.
Rule 3: Film handling third
Registered printed film needs a photo-eye and servo feed; plain film tolerates a simpler machine.
Rule 4: Seal type fourth
Choose fin or lap seal from the bag appearance and product; the seal station differs.
Rule 5: Atmosphere fifth
Fresh products needing shelf life use gas flush; ambient goods skip it.
Rule 6: Changeover sixth
Many SKUs need three-servo recipe control; a single product can use a fixed mechanical setup.
8. Alternatives compared head to head
Flow wrapping competes with vertical form-fill-seal, manual bagging and thermoforming, and the choice is set by product orientation and whether the item is loaded horizontally.
| Criterion | YC600W Servo Reciprocating Packaging Machine | Vertical VFFS | Thermoforming | Hand bagging |
|---|---|---|---|---|
| Product loading | Horizontal, oriented | Vertical, bulk | Web-formed cavity | Manual |
| Rate | 40 – 230 packs/min | High, loose fill | 6 – 12 cycles/min | Slow |
| Presentation | Single visible item | Bulk packs | Rigid sealed pack | Inconsistent |
| Best fit | Single oriented items | Granular, snacks | Modified atmosphere | Samples |
| Limitation | Needs orientation | Not for single items | Film cost, slower | No scale |
Flow wrap is the answer where each oriented item is shown individually; bulk granular products suit VFFS and MAP packs suit thermoforming.
9. Line integration
The machine sits at one station in a wider line and needs matched feed and discharge conveyors with the same pitch and height as the adjacent equipment.
The signals worth wiring are item-present, consumable-low and fault, so the line can stop cleanly rather than pile product into a stopped station.
Before layout, confirm the utilities at the exact position: power, any compressed air and the clearance needed for service access.
10. Hygiene, materials and compliance
In food rooms the contact surfaces and frame are specified for cleaning, with the finish and protection rating set by whether the area is wet or dry.
Dust and debris collect under the frame and inside the guards, so a frame with clearance and removable covers is both a hygiene and a maintenance decision.
Where the environment is cold, wet or corrosive, the consumables and seals are specified for that condition rather than using the standard build.
11. Installation and commissioning
| Stage | Duration | Who does it | Deliverable |
|---|---|---|---|
| Site and utility check | 1–2 weeks before shipment | Buyer + engineer (remote) | Signed utility checklist |
| Mechanical installation | 1–2 days | Buyer rigging, supervised | Levelled, anchored, aligned |
| Power and air connection | 1 day | Buyer electrician + engineer | Services at specification |
| Dry run and calibration | 1 day | Our engineer | Settings verified on product |
| Production trial | 1 day | Both parties | Signed handover, target rate |
A standard station installs in two to three days; variants with heat, glue or extra heads take longer because those services are tested separately.
12. Maintenance, spares and uptime
The wear parts listed below set the real uptime more than the motor does, and they are cheap to hold locally and expensive to wait for after a stop.
Keep the first spare kit on site from commissioning and record the actual replacement intervals from the first months rather than applying generic schedules.
| Wear part | Interval | Cost band | Downtime if ignored |
|---|---|---|---|
| Cross-seal jaws | 12 – 24 months | US$ 100 – 350 | Weak seal, tearing |
| Fin seal rollers | 12 months | US$ 40 – 120 | Open fin seam |
| Knife / blade | 6 – 12 months | US$ 25 – 90 | Ragged cut |
| Drive belts | 12 – 24 months | US$ 30 – 100 | Timing drift, slip |
13. Cost structure and total cost of ownership
The machine price is the visible cost, but over five years the consumables, the changeover labour and the stops from worn parts usually exceed it.
Add the labour the station replaces and the product it saves from rejection; these two lines are what justify automation rather than the headline speed alone.
| Cost line | Typical band | Notes |
|---|---|---|
| Machine, FOB | US$ 8,000 – 35,000 | Excludes freight, duties, installation |
| Sea freight + insurance | US$ 600 – 2,400 | Depends on volume and port |
| Installation | US$ 800 – 2,600 | Per complexity and site days |
| Training | Included | With written procedures |
| Consumables / spares | Per volume | Recurring, locally sourced |
| Power and air | Per local tariff | Set by heater and motor load |
14. RFQ checklist
A quotation is only as precise as the inputs behind it. Buyers who send these fourteen data points in the first email typically receive a firm price and a layout drawing on the first reply; buyers who send "a filling machine, about 5,000 an hour" spend three rounds establishing what that means.
- Exact pack dimensions: smallest and largest, with material and weight
- Target rate and the shift pattern behind it
- Number of formats and how often they change in a week
- Consumable type and specification, with current supplier
- Upstream and downstream machines with their speeds
- Floor space, ceiling height and utility position
- Power: voltage, phases, frequency and capacity
- Compressed air pressure and free capacity, if required
- Working environment: dry, wet, cold, dusty or corrosive
- Required compliance and the acceptance criteria at handover
- Budget band and decision date
- Whether a local service partner is needed
- Sample product or pack sent for trial
- Documentation language and certification needs
15. Quality assurance and FAT documentation
The factory run is performed on the buyer's own pack where possible, with the rate and quality recorded rather than asserted.
Acceptance criteria are written in numbers before the order and used at both the factory and site tests.
The document pack, calibration record and compliance declaration are checked against the order list before dispatch.
- Mechanical and electrical drawings with a spare-parts list
- Calibration and test record with the measured rate and quality
- Compliance declaration and the supporting risk assessment
- Operation and maintenance manual in English
- Material and component certificates where applicable
- Warranty terms in writing
16. Frequently asked questions
Upper or lower film?
These machines feed the film from above the product and form it into a tube; the model sets the exact path and bag dimensions.
What products need box-motion jaws?
Long products and the highest speeds use reciprocating box-motion jaws so the film is not stopped; shorter items run on standard rotary jaws.
Can it run registered printed film?
Yes on the three-servo versions with a photo-eye, which aligns the printed mark; plain film runs on the simpler frames.
17. Footprint, utilities and infrastructure
Site planning fails more often on ceiling height and drain position than on floor area, so check these three numbers before the layout is drawn: the height needed for nozzle lift plus the tallest container, the distance from the machine to the nearest drain, and the free capacity on your compressed-air ring main at shift start, when every other machine is also drawing air.
| Item | Requirement | Note |
|---|---|---|
| Floor area | 2.4 x 1.3 m for the machine, plus 1.2 m service access on each side | Access is for the mechanic, not for the operator |
| Ceiling height | 1.9 m minimum above the frame | Nozzle lift plus container height |
| Power | 3 kW, 380 V three-phase, 50 or 60 Hz | Separate circuit with earth, not shared with welders |
| Compressed air | 0.6 MPa, 0.4 m3/min free capacity | Dry air; moisture causes valve sticking |
| Drain | Within 1.5 m of the machine | For washdown and for the drip tray outlet |
| Noise | Under 75 dB(A) at 1 m | Most of it comes from the vacuum pump or blower, not the filler |
A common mistake is to install the machine against a wall to save floor space. The service access on the left side is where the mechanic reaches the drive and the valve manifold; blocking it turns a fifteen-minute job into a two-hour dismantling job, and in practice it also means the machine is never serviced properly.
18. Application scenarios by industry
The same machine is bought for very different reasons, and the configuration that suits one industry is often wrong for another. These four patterns cover most of the enquiries we receive, and each one points to a different set of options.
Food and beverage producers usually need washdown-capable surfaces, food-contact declarations and a changeover fast enough to run three products in a shift. Their decision is driven by the retailer audit, and the machine is specified with stainless frame, IP65 electrics and removable nozzles. Their biggest hidden cost is not the machine but the changeover labour they did not plan for.
Cosmetic and personal-care producers fill smaller volumes at lower output, and their constraint is appearance: no drips on the bottle shoulder, no product in the thread, consistent fill line across a batch. They need a back-suction or suck-back nozzle and a slower final approach more than they need speed, and they usually regret buying a machine sized for output rather than for cleanliness.
Pharmaceutical and diagnostic producers buy documentation as much as hardware. The filling head is secondary to the material traceability, the validation package and the ability to prove that cleaning was effective. Their machine is 316L, their seals are PTFE, and their acceptance test is a written protocol rather than a visual check.
Chemical and household producers fill corrosive or volatile liquids where the wetted material and the seal elastomer decide the machine life. They need Viton or PTFE seals, a stainless frame, and often an extraction hood over the filling zone. Accuracy is less critical than containment, and the machine should be specified accordingly.
19. Supplier evaluation: seven questions with answers you should accept
Buying a filling machine is a comparison between suppliers as much as between machines, and the difference shows up in the second year rather than the first. These seven questions are the ones that separate a supplier who builds machines from one who resells them, and each has an answer you can check against a document.
1. Can you show the calibration record for every head?
A serious supplier weighs thirty bottles per head and reports mean and standard deviation per head, not a single number for the machine. If a head is 2 % off while the average looks fine, the record exposes it and the machine should not ship.
2. What is the spare-part lead time for wear items?
Nozzle seals and valve seats should be shippable in under a week from stock. If the answer is "we order from the OEM", your machine stops for two weeks the first time a seal fails, and seals always fail.
3. Who signs the acceptance test, and against what criteria?
The criteria should be written before the order, in numbers: output over four hours, volume tolerance, drip count, reject rate. A supplier who will not commit to numbers is telling you the numbers are not stable.
4. What is the changeover procedure, and who can perform it?
An operator should be able to change format in under ten minutes with a recipe call and one tool. If the answer involves a mechanic and a spanner, add the labour cost to your five-year total before you compare prices.
5. Which parts are bought in, and from where?
Servo drives, PLCs, pneumatic valves and load cells are branded components, and their availability in your region decides whether a breakdown is a two-day or a two-month event. Ask for the brand list and check local distribution before you sign.
6. What does commissioning include, and what costs extra?
Installation, calibration, training and a production trial should be itemised. The expensive surprises are usually crane hire, extra engineers beyond the agreed days, and re-commissioning after your utilities turn out to be out of specification.
7. Can we speak to a customer running the same product?
A supplier with a real installed base can name two or three references on request. Vague answers here are the single strongest signal to slow down.
20. The first 90 days after arrival
The first three months decide whether the machine settles into a rhythm or becomes a source of daily firefighting. Most of what goes wrong in this window is procedural rather than mechanical, and it is fixable if it is watched.
Days 1 to 10: install, level and align to the conveyor, verify rotation direction and air pressure, then run empty containers through every station by hand before powering the filling circuit. Record the as-built settings in the manual rather than on a note taped to the frame.
Days 11 to 30: calibrate each head on your own product at your own filling temperature, then run a full shift at 70 % of rated output and log volume every hour. The drift pattern in this shift predicts the maintenance interval better than any manual.
Days 31 to 60: train a second operator and one mechanic, not just the person who will run the day shift. Single-person knowledge is the most common cause of a line that cannot run at weekends or during holidays.
Days 61 to 90: review the reject log, count the stops and their causes, and set the first preventive-maintenance dates from the real failure pattern rather than the generic intervals in the manual. Order the first spare kit before the end of this window, because the first seal failure usually arrives around month four.
21. Specification mistakes that cost buyers money later
Nearly every unhappy installation traces back to a decision made in the quotation stage, when a number was accepted without being checked. These six mistakes appear often enough to be predictable, and each is cheap to avoid at order and expensive to correct after arrival.
Accepting output quoted without container details
A speed quoted in bottles per hour means nothing until it is tied to a fill volume, a neck diameter and a product viscosity. Ask for the test conditions in writing: 500 ml, 28 mm neck, water at 20 °C is a very different machine from 1 L, 18 mm neck, syrup at 12 °C.
Buying the maximum head count the budget allows
More heads raise output, but they also raise air consumption, spill risk, calibration work and the cost of every future seal replacement. A machine with eight heads running six days a week at 80 % utilisation beats a twelve-head machine running three days at 45 %.
Forgetting the conveyor pitch
The filling machine, the capper and the labeller must share a container pitch and a conveyor height. When they do not, the integrator builds a transfer plate and a pitch change, and the buyer pays for it in commissioning time and in jams that never quite disappear.
Under-specifying the electricals
IP65 electrics, a separate earth and a dedicated circuit cost a few hundred dollars at order. Retrofitting them into a running line costs a shutdown, a new cabinet and an electrician, and until it is done the machine is a washdown hazard.
Buying seals by price
A seal that costs two dollars less and lasts half as long doubles your maintenance labour and adds a failure mode in the middle of a production run. Specify the elastomer by product compatibility, not by unit cost.
Treating training as a formality
Two days of training with written SOPs is the cheapest reliability investment available. Buyers who skip it usually spend the same money later on a service visit to fix problems the manual already described.
22. Comparing quotations line by line
Three quotations for the same nominal machine can differ by 40 % and still describe the same hardware, because what sits inside the price is different. The line-by-line comparison below is the one we recommend to buyers, and it is also the format our own proposals follow so that the differences are visible rather than buried in a total.
What should be inside the base price
The base price should include the machine as specified, one set of tooling for the agreed format, the control system with its recipe memory, guards and interlocks, an English manual, a tool kit and a spare seal set. If any of those appear as separate lines in a competing quotation, the totals are not comparable and the cheaper number is usually the one with more excluded.
What should be quoted separately, and why
Freight, insurance, duties, installation, training beyond the included days, custom tooling and optional inspection equipment should be separate. That is not a trick; it lets you see the cost of each decision. The trick is the opposite: a single lump sum that hides a two-week commissioning visit inside a number you cannot audit.
Warranty terms
Compare the duration, what is covered, who pays the freight on a warranty part, and what voids the warranty. Twelve months on parts with buyer-paid freight is very different from twelve months including freight and labour. Ask for the wording, not the summary.
Payment schedule and risk
Thirty per cent deposit and seventy per cent against documents is the common structure for export. A supplier asking for the full amount before dispatch is asking you to carry all the risk; a supplier accepting ten per cent deposit is carrying it themselves. The schedule tells you something about who expects to have problems.
Lead time and its components
Ask for the split between engineering, procurement, assembly, testing and packing. A lead time of forty days that is thirty days of waiting for a servo drive is a different risk from forty days of assembly. When a date slips, the split tells you whether to push the supplier or the component.
23. Questions procurement teams ask us most often
Can you supply the same machine on 415 V, 60 Hz?
Yes. Voltage, phase and frequency are specified at order because they change the motors, the drives and the transformer sizing. Changing them after the machine is built means replacing components, and it is one of the few specifications that cannot be adjusted on site.
What is the actual delivery time to our port?
Production lead time is 25 to 45 days, sea freight to most destinations is 18 to 35 days, and port-to-door adds three to ten days depending on customs. The total is what your planning needs, and it is usually 8 to 12 weeks from order to a machine running in your plant.
Do you provide a local installation service?
We send engineers from the factory for installation and commissioning, and for repeat buyers we can arrange a local partner for routine service. Installation by the factory team is the option we recommend for a first machine, because it transfers the process knowledge as well as the hardware.
What happens if a part fails in the first year?
Warranty parts ship by air within three working days of a confirmed diagnosis, and we ask for photographs and the fault code so the diagnosis is right the first time. For critical wear items we recommend holding a local kit, which costs a few hundred dollars and removes the air-freight delay entirely.
Can the machine be audited before we release the balance?
Yes. The factory acceptance test is the natural point: you or your third-party inspector attend, watch the run, review the calibration data and the material certificates, and the balance is released against a signed report. Buyers who skip this step sometimes discover a specification mismatch only after the container arrives.
24. Service levels, response times and what we commit to in writing
Service is the part of a machine purchase that buyers cannot inspect before they pay, which is exactly why it deserves a place in the comparison spreadsheet. What follows is what we put in the contract rather than what we say in a sales meeting, and we recommend asking every competing supplier the same four questions.
Response time
First technical response within one working day of a written query with photographs and the fault code. Remote diagnosis within two days. Where a site visit is needed, an engineer is dispatched within five working days, or sooner if the line is stopped.
Spare parts
Wear items from stock, shipped within three working days by air. Non-stock parts are quoted with a lead time in writing. The recommended spare kit is listed in the manual with part numbers, so you can reorder from any distributor rather than only from us.
Warranty
Twelve months on parts and labour for defects in manufacture, twenty-four months on the frame. Consumables and wear items are excluded, which is normal, but the exclusion list is written down rather than implied. Warranty freight is covered by us for the first shipment of a replacement part.
Training and knowledge transfer
Two days of on-site training are included with commissioning: one day for operators covering start-up, changeover, cleaning and the first line of fault finding, and one day for the mechanic covering adjustment, wear inspection and the spare-parts replacement procedure. Both days end with a written SOP that your team keeps.
What we do not promise
We do not promise a response time measured in hours, because a promise that cannot be kept is worse than a realistic one. We do not promise that a machine will run at its maximum output indefinitely; we promise the tested output on the format and product used at acceptance, and we document the conditions. Buyers who want a guarantee on through-life output should buy a service contract, and we quote those separately so the cost is visible.
27. Handover, acceptance and what to verify on site
At handover, verify the machine on the actual pack and rate it was sold for, and confirm the wear-part list and spare kit are physically present.
The first weeks are used to set the real maintenance intervals from observed wear and to train a second operator so the station is not dependent on one person.
Send your container and product details
Send the pack dimensions, target rate and working environment. We reply with a priced proposal and a layout within two working days.
Request a quotation See the whole Pillow / flow wrapping range
