Online Pallet Wrapper with Conveyor | 30 Pallets/h | SUNAURA
A Online automatic wrapper selected by pallet rate, load stability and whether the wrapper sits inline or at a dispatch station.
| Output | see specification |
|---|---|
| Configuration | Single station |
| Accuracy | per specification |
| Price band (FOB) | US$ 6,000 – 30,000 |
| Lead time | 25 – 45 days |
1. Who this machine is for, and who should not buy it
This machine is bought by plants and warehouses that ship palletised loads and need the load to survive the trailer without film waste. The decision is about loads per day, load stability and whether the wrapper is part of a line or a standalone dispatch station.
It is the wrong choice when the load is unstable at the top, when the pallet is loaded unevenly, or when the rate is under about 20 pallets per day and manual wrapping is still economic. Film does not fix a badly built pallet.
The realistic buyer ships 30 to 300 pallets per day, has one or two pallet footprints, and wants film consumption under control as much as labour saving.
2. How it works
The load rotates on a turntable, or the film carriage rotates around a stationary load, while the carriage travels vertically to build overlapping layers. Film is pre-stretched by mechanical gearing so that a metre of film covers more than a metre of load, which is where the cost saving comes from.
Pre-stretch ratio is the number that decides film cost. At 250 % pre-stretch, one kilogram of film wraps roughly three times the load it would at 100 %, and the machine, not the operator, controls it. A manual wrapper cannot reproduce that ratio.
Containment force is the quality number. Too little and the load shifts in transit; too much and it crushes the cartons or deforms the pallet. Force is set by film tension and by the number of top and bottom wraps, and it should be recorded per product, not left to the operator.
3. Configuration matrix: what changes and what it costs you
The same base frame is sold in several configurations, and the differences matter more than the marketing names suggest. The table below maps each configuration to the buyer profile it actually fits, so you can rule out options before they appear in a quotation.
| Configuration | Heads | Typical output | Container range | Best for | Trade-off |
|---|---|---|---|---|---|
| Semi-automatic turntable | Turntable | 15 – 30 pallets/h | 1 footprint | Low volume dispatch | Operator loads and starts each cycle |
| Automatic turntable inline | Turntable | 25 – 45 pallets/h | 1 – 2 footprints | Line end | Needs conveyor interface |
| Rotary arm | Arm | 30 – 60 pallets/h | Tall or heavy loads | Unstable or very tall loads | Larger footprint |
| Ring wrapper | Ring | 40 – 80 pallets/h | Long or narrow loads | Profiles, doors, panels | Limited to specific shapes |
| Top-press | Turntable + press | 20 – 40 pallets/h | Light, unstable loads | Light cartons, empty containers | Press adds changeover |
| Online automatic | Conveyorised | 40 – 80 pallets/h | High throughput | Distribution centres | Highest price, most integration |
The load decides more than the rate. A tall, top-heavy load needs a rotary arm or a top press because a turntable cannot accelerate it without tipping. A stable load at 40 pallets an hour does not need a ring wrapper.
4. Technical specifications
Figures below are the standard build. Every value can be changed, but each change moves price, lead time and the commissioning effort, so read the notes column before asking for a variant.
| Parameter | Standard | Optional / range | Why it matters |
|---|---|---|---|
| Type | Online automatic wrapper | Online automatic wrapper | Fixed at order |
| Rate | 15 – 80 pallets/h | Per load and pattern | Quote with wrap height |
| Load size | Up to 1,200 × 1,200 mm | Up to 1,500 mm | Larger needs a custom frame |
| Load height | Up to 2,000 mm | Up to 2,400 mm | Check ceiling |
| Load weight | Up to 1,500 kg | Up to 2,000 kg | Turntable bearing limit |
| Film | LLDPE 20 – 30 µm | Pre-stretch up to 300 % | Thinner film saves money if the machine controls tension |
| Pre-stretch | Motorised, 150 – 300 % | Mechanical on entry models | The cost lever |
| Wrapping pattern | Top / bottom wraps, overlap | Programmable per recipe | More wraps, more film |
| Control | PLC + HMI | Recipe per load | Recipes prevent operator drift |
| Safety | Fence or scanner | Light curtain at infeed | CE requires guarding |
| Film brake | Mechanical | Servo-controlled | Servo holds force constant |
| Power | 1.5 – 3 kW | Up to 5 kW online | 380 V three-phase |
5. Throughput and capacity planning
Rate is pallets per hour including load transfer. A wrapper that completes a cycle in 60 seconds does 60 pallets an hour only if a load is always ready; with manual loading the real rate is 20 to 30, and that is the number that decides the payback.
Film consumption is the number worth measuring. A wrapper using 220 g of film per pallet against one using 340 g saves 35 % of film, and at 100 pallets a day that is a tonne of film a year.
Where the wrapper is inline, the transfer time dominates. A 25-second wrap with a 20-second transfer is a 45-second cycle, and buying a faster wrapper without a faster transfer buys nothing.
| Shift pattern | Gross output | OEE at 65% | Annual bottles (300 days) |
|---|---|---|---|
| 1 × 8 h | 60 bph | 39 bph | 93,600 |
| 2 × 8 h | 60 bph | 39 bph | 187,200 |
| 3 × 8 h | 60 bph | 39 bph | 280,800 |
Size the machine on the middle of the range, not the top. A unit sold at 60 bottles per hour that runs at 60 for six hours a day is being asked to live at its mechanical limit; the same unit at 45 bottles per hour has headroom for viscosity drift, cap changes and the occasional slow batch.
6. Product and container fit
Fit is decided by load stability, not by pallet size. A load that is square, even and dense wraps on a turntable at high speed; a load that leans or has an overhanging top layer needs a rotary arm and a top press.
Film structure matters too. A 20 µm film with high pre-stretch is adequate for stable loads and fails on rough edges; a 30 µm film holds better and costs more per pallet, so the film and the load have to be matched.
| Product type | Viscosity band | Fit | What to watch |
|---|---|---|---|
| Stable cartons, square load | even | Excellent | Turntable at full rate |
| Tall, top-heavy load | uneven | Good with rotary arm | Turntable would tip it |
| Light cartons | low weight | Good with top press | Press prevents lifting |
| Bags on pallet | soft, shifting | Conditional | Needs more wraps and force |
| Profiles and panels | long, narrow | Good with ring wrapper | Ring handles length |
| Rough or sharp edges | abrasive | Conditional | Film punctures; use thicker film |
7. Selection decision framework
Use these rules in order. Each one is a hard filter, not a preference, and each is written so that two buyers with different constraints reach different answers rather than the same recommendation.
Rule 1: Load stability first
If the load leans or the top layer is loose, choose a rotary arm or a top press. A turntable accelerates the load and a marginal load falls over at 30 pallets an hour.
Rule 2: Film cost second
Compare film grams per pallet, not film price per kilogram. A machine with 300 % pre-stretch and servo tension usually wins on film within a year.
Rule 3: Rate third
Count the transfer time in the cycle. Manual loading caps the rate at 20 to 30 pallets an hour regardless of the wrapper.
Rule 4: Footprint fourth
A rotary arm needs about 40 % more floor than a turntable. In a full warehouse that space is the constraint, not the machine price.
Rule 5: Integration fifth
An inline wrapper needs conveyor interfaces, pallet-present sensors and a handshake with the palletizer. Buying an automatic wrapper without the conveyor interface is a common and expensive omission.
Rule 6: Guarding sixth
Automatic wrappers need fencing or a safety scanner for CE. A semi-automatic unit needs a stop circuit and a safe distance, which is a smaller job.
8. Alternatives compared head to head
Wrapping competes with manual film, with shrink wrapping and with no wrapping at all, and the choice is decided by load stability and by how much damage the load suffers in transit.
| Criterion | Online Pallet Wrapper with Conveyor | 30 Pallets/h | SUNAURA | Stretch wrapping | Manual wrapping | Shrink wrapping |
|---|---|---|---|---|
| Film cost per pallet | Low with pre-stretch | High, no pre-stretch | Medium | see specification |
| Labour | None inline | 1 operator per station | 1 operator | see specification |
| Load containment | Good, tension controlled | Depends on operator | Best, film shrinks tight | see specification |
| Equipment cost | US$ 3,000 – 45,000 | None | US$ 20,000 – 90,000 | see specification |
| Best fit | Most pallet loads | Low volume | Weatherproof, retail display | see specification |
Manual wrapping is the cheapest to start and the most expensive per pallet: an operator uses 30 to 50 % more film than a machine with controlled pre-stretch. Shrink wrapping gives the tightest load and needs a heat tunnel, which is a different investment entirely.
9. Line integration
Inline, the wrapper sits after the palletizer and before dispatch. It needs a pallet conveyor, a pallet-present sensor and a handshake so the palletizer does not release a pallet mid-wrap.
The film carriage and the load height must be checked against the tallest load you will ever run, not the average. A wrapper rated to 2,000 mm that meets a 2,150 mm load once a week will be bypassed and the load wrapped by hand.
Signals worth agreeing: pallet-present, wrap-complete, film-end warning and fault. A film-end warning is worth having, because a wrapper that runs out mid-pallet produces a load that looks wrapped and is not.
10. Hygiene, materials and compliance
Wrappers are not food-contact equipment, but in food warehouses the film and the carriage collect dust. A cleanable frame and a covered film roll keep auditors satisfied.
The film itself needs a declaration if it contacts the product directly, which it does on tray-only loads. Ask the film supplier for it rather than the machine builder.
In cold stores the machine needs low-temperature film and a drive rated for the room. Standard film becomes brittle at -18 °C and snaps at the carriage.
11. Installation and commissioning
| Stage | Duration | Who does it | Deliverable |
|---|
A turntable wrapper installs in one day; an inline automatic installation takes three to five days because of the conveyor interface and the handshake testing with the palletizer.
12. Maintenance, spares and uptime
The film carriage, the pre-stretch rollers and the turntable bearing take the maintenance. Worn pre-stretch rollers slip and the film ratio drifts, which shows up as increased film consumption before any mechanical failure.
Keep a set of pre-stretch rollers, a film carriage drive belt and a turntable bearing. These are the parts that stop the wrapper, and the rollers are the cheapest consumable to keep on the shelf.
| Wear part | Interval | Cost band | Downtime if ignored |
|---|---|---|---|
| Pre-stretch rollers | 12 – 18 months | US$ 60 – 200 per set | Film slip, higher consumption |
| Carriage drive belt | 12 months | US$ 25 – 70 | Carriage stall |
| Turntable bearing | 24 – 36 months | US$ 150 – 400 | Wobble, noise |
| Film cut / clamp | 12 months | US$ 30 – 90 | Film tail not cut |
13. Cost structure and total cost of ownership
Film is the dominant cost, and the machine decides how much film is used. At 250 % pre-stretch a pallet takes about 180 g of film; at 100 % it takes about 320 g. At 100 pallets a day the difference is 5 tonnes of film a year.
Compare on film grams per pallet plus labour plus maintenance, and treat the machine price as the smaller part of the decision. Buyers who choose on machine price alone usually pay it back in film within 18 months.
| Cost line | Typical band | Notes |
|---|---|---|
| Machine, FOB | US$ 3,000 – 45,000 | Type and automation |
| Film | US$ 0.30 – 0.90 per pallet | Pre-stretch ratio decides |
| Power | US$ 0.10 – 0.30 per pallet | Turntable motor |
| Spares, year 1 | US$ 200 – 700 | Rollers and belts |
| Labour | None inline | 1 operator if manual load |
| Install | US$ 300 – 2,000 | Inline integration costs more |
14. RFQ checklist
A quotation is only as precise as the inputs behind it. Buyers who send these fourteen data points in the first email typically receive a firm price and a layout drawing on the first reply; buyers who send “a filling machine, about 5,000 an hour” spend three rounds establishing what that means.
15. Quality assurance and FAT documentation
Factory acceptance wraps a load of your dimensions at the quoted rate and records film consumption per pallet, wrap force and cycle time. Film grams per pallet is the acceptance number, not the photograph of a wrapped load.
Ask for the recipe to be written per product with the top and bottom wrap counts and the carriage speed, because those settings decide both containment and cost.
16. Frequently asked questions
How much film does it use per pallet?
Typically 150 to 250 g with 250 % pre-stretch on a standard 1,200 mm load. Without pre-stretch it is 300 to 400 g.
Can it wrap a load taller than 2 metres?
With the tall-frame option up to 2,400 mm. State the maximum height, not the average, when ordering.
Turntable or rotary arm?
Turntable for stable loads at up to 45 pallets an hour. Rotary arm for tall, heavy or unstable loads, at a larger footprint and higher price.
Do I need a top press?
If the load is light or the top layer is loose, yes. A top press holds the load down while the film tension builds.
Can it run inline with a palletizer?
Yes, with a pallet conveyor and a handshake. Plan the interface at order; retrofitting it means new controls.
What film thickness should I use?
20 to 23 µm for stable loads, 25 to 30 µm for rough edges or cold stores. Thinner film saves money only when the machine controls tension.
17. Footprint, utilities and infrastructure
Site planning fails more often on ceiling height and drain position than on floor area, so check these three numbers before the layout is drawn: the height needed for nozzle lift plus the tallest container, the distance from the machine to the nearest drain, and the free capacity on your compressed-air ring main at shift start, when every other machine is also drawing air.
| Item | Requirement | Note |
|---|---|---|
| Floor area | 2.4 x 1.3 m for the machine, plus 1.2 m service access on each side | Access is for the mechanic, not for the operator |
| Ceiling height | 1.9 m minimum above the frame | Nozzle lift plus container height |
| Power | 3 kW, 380 V three-phase, 50 or 60 Hz | Separate circuit with earth, not shared with welders |
| Compressed air | 0.6 MPa, 0.4 m3/min free capacity | Dry air; moisture causes valve sticking |
| Drain | Within 1.5 m of the machine | For washdown and for the drip tray outlet |
| Noise | Under 75 dB(A) at 1 m | Most of it comes from the vacuum pump or blower, not the filler |
A common mistake is to install the machine against a wall to save floor space. The service access on the left side is where the mechanic reaches the drive and the valve manifold; blocking it turns a fifteen-minute job into a two-hour dismantling job, and in practice it also means the machine is never serviced properly.
18. Application scenarios by industry
The same machine is bought for very different reasons, and the configuration that suits one industry is often wrong for another. These four patterns cover most of the enquiries we receive, and each one points to a different set of options.
Food and beverage producers usually need washdown-capable surfaces, food-contact declarations and a changeover fast enough to run three products in a shift. Their decision is driven by the retailer audit, and the machine is specified with stainless frame, IP65 electrics and removable nozzles. Their biggest hidden cost is not the machine but the changeover labour they did not plan for.
Cosmetic and personal-care producers fill smaller volumes at lower output, and their constraint is appearance: no drips on the bottle shoulder, no product in the thread, consistent fill line across a batch. They need a back-suction or suck-back nozzle and a slower final approach more than they need speed, and they usually regret buying a machine sized for output rather than for cleanliness.
Pharmaceutical and diagnostic producers buy documentation as much as hardware. The filling head is secondary to the material traceability, the validation package and the ability to prove that cleaning was effective. Their machine is 316L, their seals are PTFE, and their acceptance test is a written protocol rather than a visual check.
Chemical and household producers fill corrosive or volatile liquids where the wetted material and the seal elastomer decide the machine life. They need Viton or PTFE seals, a stainless frame, and often an extraction hood over the filling zone. Accuracy is less critical than containment, and the machine should be specified accordingly.
19. Supplier evaluation: seven questions with answers you should accept
Buying a filling machine is a comparison between suppliers as much as between machines, and the difference shows up in the second year rather than the first. These seven questions are the ones that separate a supplier who builds machines from one who resells them, and each has an answer you can check against a document.
1. Can you show the calibration record for every head?
A serious supplier weighs thirty bottles per head and reports mean and standard deviation per head, not a single number for the machine. If a head is 2 % off while the average looks fine, the record exposes it and the machine should not ship.
2. What is the spare-part lead time for wear items?
Nozzle seals and valve seats should be shippable in under a week from stock. If the answer is “we order from the OEM”, your machine stops for two weeks the first time a seal fails, and seals always fail.
3. Who signs the acceptance test, and against what criteria?
The criteria should be written before the order, in numbers: output over four hours, volume tolerance, drip count, reject rate. A supplier who will not commit to numbers is telling you the numbers are not stable.
4. What is the changeover procedure, and who can perform it?
An operator should be able to change format in under ten minutes with a recipe call and one tool. If the answer involves a mechanic and a spanner, add the labour cost to your five-year total before you compare prices.
5. Which parts are bought in, and from where?
Servo drives, PLCs, pneumatic valves and load cells are branded components, and their availability in your region decides whether a breakdown is a two-day or a two-month event. Ask for the brand list and check local distribution before you sign.
6. What does commissioning include, and what costs extra?
Installation, calibration, training and a production trial should be itemised. The expensive surprises are usually crane hire, extra engineers beyond the agreed days, and re-commissioning after your utilities turn out to be out of specification.
7. Can we speak to a customer running the same product?
A supplier with a real installed base can name two or three references on request. Vague answers here are the single strongest signal to slow down.
20. The first 90 days after arrival
The first three months decide whether the machine settles into a rhythm or becomes a source of daily firefighting. Most of what goes wrong in this window is procedural rather than mechanical, and it is fixable if it is watched.
Days 1 to 10: install, level and align to the conveyor, verify rotation direction and air pressure, then run empty containers through every station by hand before powering the filling circuit. Record the as-built settings in the manual rather than on a note taped to the frame.
Days 11 to 30: calibrate each head on your own product at your own filling temperature, then run a full shift at 70 % of rated output and log volume every hour. The drift pattern in this shift predicts the maintenance interval better than any manual.
Days 31 to 60: train a second operator and one mechanic, not just the person who will run the day shift. Single-person knowledge is the most common cause of a line that cannot run at weekends or during holidays.
Days 61 to 90: review the reject log, count the stops and their causes, and set the first preventive-maintenance dates from the real failure pattern rather than the generic intervals in the manual. Order the first spare kit before the end of this window, because the first seal failure usually arrives around month four.
21. Specification mistakes that cost buyers money later
Nearly every unhappy installation traces back to a decision made in the quotation stage, when a number was accepted without being checked. These six mistakes appear often enough to be predictable, and each is cheap to avoid at order and expensive to correct after arrival.
Accepting output quoted without container details
A speed quoted in bottles per hour means nothing until it is tied to a fill volume, a neck diameter and a product viscosity. Ask for the test conditions in writing: 500 ml, 28 mm neck, water at 20 °C is a very different machine from 1 L, 18 mm neck, syrup at 12 °C.
Buying the maximum head count the budget allows
More heads raise output, but they also raise air consumption, spill risk, calibration work and the cost of every future seal replacement. A machine with eight heads running six days a week at 80 % utilisation beats a twelve-head machine running three days at 45 %.
Forgetting the conveyor pitch
The filling machine, the capper and the labeller must share a container pitch and a conveyor height. When they do not, the integrator builds a transfer plate and a pitch change, and the buyer pays for it in commissioning time and in jams that never quite disappear.
Under-specifying the electricals
IP65 electrics, a separate earth and a dedicated circuit cost a few hundred dollars at order. Retrofitting them into a running line costs a shutdown, a new cabinet and an electrician, and until it is done the machine is a washdown hazard.
Buying seals by price
A seal that costs two dollars less and lasts half as long doubles your maintenance labour and adds a failure mode in the middle of a production run. Specify the elastomer by product compatibility, not by unit cost.
Treating training as a formality
Two days of training with written SOPs is the cheapest reliability investment available. Buyers who skip it usually spend the same money later on a service visit to fix problems the manual already described.
22. Comparing quotations line by line
Three quotations for the same nominal machine can differ by 40 % and still describe the same hardware, because what sits inside the price is different. The line-by-line comparison below is the one we recommend to buyers, and it is also the format our own proposals follow so that the differences are visible rather than buried in a total.
What should be inside the base price
The base price should include the machine as specified, one set of tooling for the agreed format, the control system with its recipe memory, guards and interlocks, an English manual, a tool kit and a spare seal set. If any of those appear as separate lines in a competing quotation, the totals are not comparable and the cheaper number is usually the one with more excluded.
What should be quoted separately, and why
Freight, insurance, duties, installation, training beyond the included days, custom tooling and optional inspection equipment should be separate. That is not a trick; it lets you see the cost of each decision. The trick is the opposite: a single lump sum that hides a two-week commissioning visit inside a number you cannot audit.
Warranty terms
Compare the duration, what is covered, who pays the freight on a warranty part, and what voids the warranty. Twelve months on parts with buyer-paid freight is very different from twelve months including freight and labour. Ask for the wording, not the summary.
Payment schedule and risk
Thirty per cent deposit and seventy per cent against documents is the common structure for export. A supplier asking for the full amount before dispatch is asking you to carry all the risk; a supplier accepting ten per cent deposit is carrying it themselves. The schedule tells you something about who expects to have problems.
Lead time and its components
Ask for the split between engineering, procurement, assembly, testing and packing. A lead time of forty days that is thirty days of waiting for a servo drive is a different risk from forty days of assembly. When a date slips, the split tells you whether to push the supplier or the component.
23. Questions procurement teams ask us most often
Can you supply the same machine on 415 V, 60 Hz?
Yes. Voltage, phase and frequency are specified at order because they change the motors, the drives and the transformer sizing. Changing them after the machine is built means replacing components, and it is one of the few specifications that cannot be adjusted on site.
What is the actual delivery time to our port?
Production lead time is 25 to 45 days, sea freight to most destinations is 18 to 35 days, and port-to-door adds three to ten days depending on customs. The total is what your planning needs, and it is usually 8 to 12 weeks from order to a machine running in your plant.
Do you provide a local installation service?
We send engineers from the factory for installation and commissioning, and for repeat buyers we can arrange a local partner for routine service. Installation by the factory team is the option we recommend for a first machine, because it transfers the process knowledge as well as the hardware.
What happens if a part fails in the first year?
Warranty parts ship by air within three working days of a confirmed diagnosis, and we ask for photographs and the fault code so the diagnosis is right the first time. For critical wear items we recommend holding a local kit, which costs a few hundred dollars and removes the air-freight delay entirely.
Can the machine be audited before we release the balance?
Yes. The factory acceptance test is the natural point: you or your third-party inspector attend, watch the run, review the calibration data and the material certificates, and the balance is released against a signed report. Buyers who skip this step sometimes discover a specification mismatch only after the container arrives.
24. Service levels, response times and what we commit to in writing
Service is the part of a machine purchase that buyers cannot inspect before they pay, which is exactly why it deserves a place in the comparison spreadsheet. What follows is what we put in the contract rather than what we say in a sales meeting, and we recommend asking every competing supplier the same four questions.
Response time
First technical response within one working day of a written query with photographs and the fault code. Remote diagnosis within two days. Where a site visit is needed, an engineer is dispatched within five working days, or sooner if the line is stopped.
Spare parts
Wear items from stock, shipped within three working days by air. Non-stock parts are quoted with a lead time in writing. The recommended spare kit is listed in the manual with part numbers, so you can reorder from any distributor rather than only from us.
Warranty
Twelve months on parts and labour for defects in manufacture, twenty-four months on the frame. Consumables and wear items are excluded, which is normal, but the exclusion list is written down rather than implied. Warranty freight is covered by us for the first shipment of a replacement part.
Training and knowledge transfer
Two days of on-site training are included with commissioning: one day for operators covering start-up, changeover, cleaning and the first line of fault finding, and one day for the mechanic covering adjustment, wear inspection and the spare-parts replacement procedure. Both days end with a written SOP that your team keeps.
What we do not promise
We do not promise a response time measured in hours, because a promise that cannot be kept is worse than a realistic one. We do not promise that a machine will run at its maximum output indefinitely; we promise the tested output on the format and product used at acceptance, and we document the conditions. Buyers who want a guarantee on through-life output should buy a service contract, and we quote those separately so the cost is visible.
27. Handover, acceptance and what to verify on site
Acceptance should record film grams per pallet, cycle time and wrap force for each load type. Weigh the film roll before and after ten pallets; that number, not the brochure, is what your film budget will be built on for the next five years.
On site, check that the machine stops when the film breaks, that the film-end sensor triggers before the roll is empty, and that the safety device stops the turntable within the distance stated in the risk assessment. A turntable that coasts after the stop button is a hazard, not an inconvenience.
Ask for the recipe list and the safety risk assessment as files. The recipe list is what makes the wrapper repeatable across shifts, and without it every operator invents a different wrap.
Send your container and product details
Send the pallet dimensions and height, load weight, pallets per day and whether the wrapper is inline. We will confirm the type, the pre-stretch ratio and the film specification, and send a priced proposal with a film-consumption test protocol.