Automatic Folding and Sealing Machine

Carton sealer applying tape to a case
Carton sealing equipment

Automatic Folding and Sealing Machine

A Semi-automatic carton sealer matched to case size range, tape or glue, and the rate the packing station actually produces.

Outputsee specification
StationSingle station
Accuracyper specification
Price band (FOB)US$ 6,000 – 30,000
Lead time25 – 45 days

Get a specification sheet Jump to RFQ checklist

1. Who this machine is for, and who should not buy it

This machine is bought by packers who seal cases with tape or glue and want a consistent seal without an operator holding a dispenser. The decision is about case size range, seal method and whether the sealer is standalone or inline.

It is the wrong choice when case sizes vary so widely that the machine needs adjusting for every case, when the case is overfilled and bulges, or when the volume is under about 200 cases a day and a hand dispenser is adequate.

The realistic buyer seals 200 to 3,000 cases a day, has two to five case sizes, and needs a seal that holds in transit rather than the fastest possible machine.

2. How it works

The case is fed between side belts that drive it forward while a top or side tape head applies adhesive tape to the flap seam, with front and rear heads sealing the ends. Ergonomic models adjust the arch and the side rails by crank; automatic models do it from the HMI.

The seal quality depends on three things: belt pressure, tape tension and case squareness. A case that is not square is sealed crooked, and the tape lifts at the corner in transit; no amount of tape tension fixes that.

Glue sealing is a different principle: hot melt is applied to the flaps and the case is compressed while the adhesive sets. It is faster and cheaper per case at volume, and it needs a warm-up period and a clean nozzle, which tape does not.

3. Configuration matrix: what changes and what it costs you

The same base frame is sold in several configurations, and the differences matter more than the marketing names suggest. The table below maps each configuration to the buyer profile it actually fits, so you can rule out options before they appear in a quotation.

ConfigurationHeadsTypical outputContainer rangeBest forTrade-off
Semi-automatic, tapeSide belts15 – 25 cases/minCase 150 – 500 mmLow volume, few sizesManual size adjustment
Automatic, tapeSide belts + auto adjust20 – 40 cases/minCase 200 – 700 mmInline packingNeeds conveyor interface
Corner sealerTop + side heads10 – 20 cases/minLarge or heavy casesTall cases, exportTwo tape heads, more tape
Flaps folding + sealFolding arms + head15 – 30 cases/minStandard casesCases needing flap closureMechanical setup per size
Hot-melt glueGlue head + compression25 – 60 cases/minCase 200 – 600 mmHigh volume, low cost per caseWarm-up, nozzle cleaning
Stainless / washdownSide belts15 – 25 cases/minFood casesWet or frozen roomsHigher price, IP65

Tape is the flexible answer and the expensive one per case; glue is the cheap one per case and the inflexible one. Corner sealing is a third head and twice the tape, used where the case must survive export handling.

4. Technical specifications

Figures below are the standard build. Every value can be changed, but each change moves price, lead time and the commissioning effort, so read the notes column before asking for a variant.

ParameterStandardOptional / rangeWhy it matters
TypeSemi-automatic carton sealerSemi-automatic carton sealerFixed at order
Rate10 – 60 cases/minPer case lengthQuote at your case length
Case sizeLength 150 – 700 mmWide-range up to 900 mmSize range decides the model
Case weightUp to 25 kgUp to 50 kg heavy dutyBelt pressure follows weight
Seal methodTape (BOPP)Glue, hot meltTape is standard
Tape width48 – 72 mmStandard 50 mmWider tape, more cost
Belt speed18 – 30 m/minVariable by inverterSpeed must match packing
AdjustmentManual crankMotorised automaticAuto adjust costs more
FramePowder-coated steelStainless 304Room decides
ControlSwitch / PLCPLC with countersCounters help production tracking
AirNot required for tape0.6 MPa for glueGlue needs air
Power0.2 – 1.0 kW3 – 6 kW for glueGlue needs heat

5. Throughput and capacity planning

Rate is a function of case length and belt speed, not of the head. At 20 m/min with a 400 mm case and a 150 mm gap, the machine does about 36 cases a minute; with a 700 mm case it does 23. Always quote at your own case length.

Plan on 80 % of the quoted rate for a packing station, because the operator, not the machine, is usually the constraint. A sealer that outruns the packer creates a queue and then an idle machine.

For glue, add the warm-up time to the shift calculation. A hot-melt unit needs 15 to 25 minutes to reach temperature, and that is production time lost at every start-up.

Shift patternGross outputOEE at 65%Annual bottles (300 days)
1 × 8 h60 bph39 bph93,600
2 × 8 h60 bph39 bph187,200
3 × 8 h60 bph39 bph280,800

Size the machine on the middle of the range, not the top. A unit sold at 60 bottles per hour that runs at 60 for six hours a day is being asked to live at its mechanical limit; the same unit at 45 bottles per hour has headroom for viscosity drift, cap changes and the occasional slow batch.

6. Product and container fit

Fit is decided by case squareness and fill level. A case that is overfilled bulges and the tape bridges the gap rather than contacting the seam; a case that is underfilled collapses under belt pressure and seals crooked.

Case size range matters as much as the case itself. A machine that covers 150 to 700 mm in one frame is adjusted for every case; two machines set for two size bands often run faster than one wide-range machine adjusted constantly.

Product typeViscosity bandFitWhat to watch
Standard RSC casessquare, rigidExcellentMost common application
Tall export casessquare, heavyGood with corner sealerTwo heads, more tape
Overfilled casesbulgingConditionalSeal bridges, tape lifts
Very small casesunder 150 mmConditionalNeeds a small-frame model
Frozen or wet casesdamp surfaceConditionalTape adhesion drops; use glue or special tape
Cases with printed surfacescoatedGoodCheck tape adhesion on the coating

7. Selection decision framework

Use these rules in order. Each one is a hard filter, not a preference, and each is written so that two buyers with different constraints reach different answers rather than the same recommendation.

Rule 1: Case range first

List every case size with length, width and height. A range wider than 2:1 in length means either a wide-range machine or two machines.

Rule 2: Seal method second

Tape for flexibility and low volume; glue above roughly 500 cases a day where the cost per case matters. Glue needs warm-up and cleaning, tape needs a tape roll change every few hundred cases.

Rule 3: Belt type third

Top and bottom belts for light cases; side belts for heavy or tall cases. A top-belt machine on a 30 kg case slips and seals crooked.

Rule 4: Corner sealing fourth

Export or stacked pallets justify a corner sealer. Domestic single-layer shipments usually do not, and the second head doubles the tape cost.

Rule 5: Adjustment fifth

If operators change size more than twice a shift, motorised adjustment pays for itself in downtime. Manual cranks are fine for a single size.

Rule 6: Finish sixth

Wet or frozen rooms need stainless and IP65. A dry packing room does not, and the price difference is significant.

8. Alternatives compared head to head

Sealing competes with manual tape, with gluing and with a case erector-sealer combination, and the choice is decided by volume and case consistency.

CriterionAutomatic Folding and Sealing MachineTape sealerHot-melt glue sealerManual taping
Cost per caseTape 0.02 – 0.05Glue 0.01 – 0.02Tape 0.03 – 0.06see specification
Rate10 – 40 cases/min25 – 60 cases/min3 – 6 cases/minsee specification
Labour1 operator1 operator1 operator per stationsee specification
ChangeoverCrank adjustmentRecipe on HMINonesee specification
LimitationTape cost, adhesionWarm-up, nozzle careSlow, inconsistentsee specification
Best fitFlexible packingHigh volumeUnder 200 cases/daysee specification

Glue is cheaper per case above about 500 cases a day and less flexible below it. Manual taping is rational under 200 cases a day; above that the labour cost exceeds the machine within a year.

9. Line integration

The sealer sits at the end of the packing station, after the case is filled and closed. Upstream it needs a case that is square and not overfilled; downstream it needs a conveyor or a pallet stacking point, not a pile on the floor.

If the sealer is inline with a case erector and a labeller, the belt speed must be matched across all three. A sealer running 20 % faster than the erector creates gaps that the labeller cannot handle.

Signals worth agreeing: case-present, tape-end warning, jam fault. A tape-end warning is the cheapest upgrade on the machine, because a case sealed without tape is a case that arrives open.

10. Hygiene, materials and compliance

In food packing rooms, the sealer frame and the belts need to be cleanable and the tape head must not sit over an open product line. Stainless and IP65 are the specification for wet rooms.

Cardboard dust collects under the machine and inside the belt guards, so a frame with clearance underneath is a hygiene decision as well as a maintenance one.

Where cases are sealed in a cold room, specify low-temperature tape; standard BOPP tape loses adhesion below 5 °C and lifts in transit.

11. Installation and commissioning

StageDurationWho does itDeliverable

A tape sealer installs in half a day; a glue sealer takes two to three days including the air supply, the warm-up test and the nozzle adjustment for your case.

12. Maintenance, spares and uptime

Tape heads, belts and the glue nozzle are the wear items. A tape head that has lost tension produces seals that look right and lift in transit, so tape tension is checked weekly rather than at failure.

Keep a spare tape head assembly, a set of belts and, for glue machines, a nozzle and a heater cartridge. These are the parts that stop a packing line.

Wear partIntervalCost bandDowntime if ignored
Tape head assembly12 – 24 monthsUS$ 80 – 250Tape not applying or not cutting
Conveyor belt12 monthsUS$ 40 – 150Slip, crooked seal
Glue nozzle6 – 12 monthsUS$ 60 – 200Blocked pattern
Heater cartridge12 monthsUS$ 40 – 120No melt, cold glue

13. Cost structure and total cost of ownership

Tape or glue is the recurring cost and it dominates over five years. At 1,000 cases a day, tape at 0.03 per case is 9,000 a year against glue at 0.015, and the difference pays for a glue machine in about three years.

Add the labour the machine replaces and the cases it saves from being re-taped. A packing station that hand-tapes 600 cases a day usually has one full-time person on tape alone.

Cost lineTypical bandNotes
Machine, FOBUS$ 800 – 12,000Type and automation
Tape or glueUS$ 0.01 – 0.05 per caseDominant recurring cost
PowerUS$ 0.02 – 0.10 per hourGlue uses more
Spares, year 1US$ 150 – 600Heads, belts, nozzles
Labour1 operatorShared with packing
InstallUS$ 150 – 800Glue needs air and heat test

14. RFQ checklist

A quotation is only as precise as the inputs behind it. Buyers who send these fourteen data points in the first email typically receive a firm price and a layout drawing on the first reply; buyers who send “a filling machine, about 5,000 an hour” spend three rounds establishing what that means.

    15. Quality assurance and FAT documentation

    Factory acceptance seals 30 cases at your dimensions and rate, then inspects the seal for tape contact, corner lift and centring. The report records the tape or glue specification used and the belt pressure setting.

    Ask for a sealed case to be shipped with the machine so you can test it in your own climate. Tape that works in a temperate factory can fail in a cold store or a humid port.

      16. Frequently asked questions

      What case size range does it cover?

      150 to 700 mm length in the standard frame, up to 900 mm in wide-range models. Send every size you run, not the average.

      Tape or glue?

      Tape for flexibility and volumes under about 500 cases a day; glue above that, where the cost per case and the speed matter.

      Why does tape lift at the corners?

      Usually an overfilled case, a low tape tension or a cold case surface. Check the fill level first, then the tape tension.

      Can it handle heavy cases?

      Up to 25 kg on standard side-belt models, 50 kg on heavy-duty builds. Top-belt machines are for light cases only.

      Do I need a corner sealer?

      For export shipments and stacked pallets, usually yes. For domestic single-layer shipments, the second head adds cost without much benefit.

      How long does a tape roll last?

      About 200 to 400 cases depending on case size and tape width. A tape-end warning avoids the empty-seal case.

      17. Footprint, utilities and infrastructure

      Site planning fails more often on ceiling height and drain position than on floor area, so check these three numbers before the layout is drawn: the height needed for nozzle lift plus the tallest container, the distance from the machine to the nearest drain, and the free capacity on your compressed-air ring main at shift start, when every other machine is also drawing air.

      ItemRequirementNote
      Floor area2.4 x 1.3 m for the machine, plus 1.2 m service access on each sideAccess is for the mechanic, not for the operator
      Ceiling height1.9 m minimum above the frameNozzle lift plus container height
      Power3 kW, 380 V three-phase, 50 or 60 HzSeparate circuit with earth, not shared with welders
      Compressed air0.6 MPa, 0.4 m3/min free capacityDry air; moisture causes valve sticking
      DrainWithin 1.5 m of the machineFor washdown and for the drip tray outlet
      NoiseUnder 75 dB(A) at 1 mMost of it comes from the vacuum pump or blower, not the filler

      A common mistake is to install the machine against a wall to save floor space. The service access on the left side is where the mechanic reaches the drive and the valve manifold; blocking it turns a fifteen-minute job into a two-hour dismantling job, and in practice it also means the machine is never serviced properly.

      18. Application scenarios by industry

      The same machine is bought for very different reasons, and the configuration that suits one industry is often wrong for another. These four patterns cover most of the enquiries we receive, and each one points to a different set of options.

      Food and beverage producers usually need washdown-capable surfaces, food-contact declarations and a changeover fast enough to run three products in a shift. Their decision is driven by the retailer audit, and the machine is specified with stainless frame, IP65 electrics and removable nozzles. Their biggest hidden cost is not the machine but the changeover labour they did not plan for.

      Cosmetic and personal-care producers fill smaller volumes at lower output, and their constraint is appearance: no drips on the bottle shoulder, no product in the thread, consistent fill line across a batch. They need a back-suction or suck-back nozzle and a slower final approach more than they need speed, and they usually regret buying a machine sized for output rather than for cleanliness.

      Pharmaceutical and diagnostic producers buy documentation as much as hardware. The filling head is secondary to the material traceability, the validation package and the ability to prove that cleaning was effective. Their machine is 316L, their seals are PTFE, and their acceptance test is a written protocol rather than a visual check.

      Chemical and household producers fill corrosive or volatile liquids where the wetted material and the seal elastomer decide the machine life. They need Viton or PTFE seals, a stainless frame, and often an extraction hood over the filling zone. Accuracy is less critical than containment, and the machine should be specified accordingly.

      19. Supplier evaluation: seven questions with answers you should accept

      Buying a filling machine is a comparison between suppliers as much as between machines, and the difference shows up in the second year rather than the first. These seven questions are the ones that separate a supplier who builds machines from one who resells them, and each has an answer you can check against a document.

      1. Can you show the calibration record for every head?

      A serious supplier weighs thirty bottles per head and reports mean and standard deviation per head, not a single number for the machine. If a head is 2 % off while the average looks fine, the record exposes it and the machine should not ship.

      2. What is the spare-part lead time for wear items?

      Nozzle seals and valve seats should be shippable in under a week from stock. If the answer is “we order from the OEM”, your machine stops for two weeks the first time a seal fails, and seals always fail.

      3. Who signs the acceptance test, and against what criteria?

      The criteria should be written before the order, in numbers: output over four hours, volume tolerance, drip count, reject rate. A supplier who will not commit to numbers is telling you the numbers are not stable.

      4. What is the changeover procedure, and who can perform it?

      An operator should be able to change format in under ten minutes with a recipe call and one tool. If the answer involves a mechanic and a spanner, add the labour cost to your five-year total before you compare prices.

      5. Which parts are bought in, and from where?

      Servo drives, PLCs, pneumatic valves and load cells are branded components, and their availability in your region decides whether a breakdown is a two-day or a two-month event. Ask for the brand list and check local distribution before you sign.

      6. What does commissioning include, and what costs extra?

      Installation, calibration, training and a production trial should be itemised. The expensive surprises are usually crane hire, extra engineers beyond the agreed days, and re-commissioning after your utilities turn out to be out of specification.

      7. Can we speak to a customer running the same product?

      A supplier with a real installed base can name two or three references on request. Vague answers here are the single strongest signal to slow down.

      20. The first 90 days after arrival

      The first three months decide whether the machine settles into a rhythm or becomes a source of daily firefighting. Most of what goes wrong in this window is procedural rather than mechanical, and it is fixable if it is watched.

      Days 1 to 10: install, level and align to the conveyor, verify rotation direction and air pressure, then run empty containers through every station by hand before powering the filling circuit. Record the as-built settings in the manual rather than on a note taped to the frame.

      Days 11 to 30: calibrate each head on your own product at your own filling temperature, then run a full shift at 70 % of rated output and log volume every hour. The drift pattern in this shift predicts the maintenance interval better than any manual.

      Days 31 to 60: train a second operator and one mechanic, not just the person who will run the day shift. Single-person knowledge is the most common cause of a line that cannot run at weekends or during holidays.

      Days 61 to 90: review the reject log, count the stops and their causes, and set the first preventive-maintenance dates from the real failure pattern rather than the generic intervals in the manual. Order the first spare kit before the end of this window, because the first seal failure usually arrives around month four.

      21. Specification mistakes that cost buyers money later

      Nearly every unhappy installation traces back to a decision made in the quotation stage, when a number was accepted without being checked. These six mistakes appear often enough to be predictable, and each is cheap to avoid at order and expensive to correct after arrival.

      Accepting output quoted without container details

      A speed quoted in bottles per hour means nothing until it is tied to a fill volume, a neck diameter and a product viscosity. Ask for the test conditions in writing: 500 ml, 28 mm neck, water at 20 °C is a very different machine from 1 L, 18 mm neck, syrup at 12 °C.

      Buying the maximum head count the budget allows

      More heads raise output, but they also raise air consumption, spill risk, calibration work and the cost of every future seal replacement. A machine with eight heads running six days a week at 80 % utilisation beats a twelve-head machine running three days at 45 %.

      Forgetting the conveyor pitch

      The filling machine, the capper and the labeller must share a container pitch and a conveyor height. When they do not, the integrator builds a transfer plate and a pitch change, and the buyer pays for it in commissioning time and in jams that never quite disappear.

      Under-specifying the electricals

      IP65 electrics, a separate earth and a dedicated circuit cost a few hundred dollars at order. Retrofitting them into a running line costs a shutdown, a new cabinet and an electrician, and until it is done the machine is a washdown hazard.

      Buying seals by price

      A seal that costs two dollars less and lasts half as long doubles your maintenance labour and adds a failure mode in the middle of a production run. Specify the elastomer by product compatibility, not by unit cost.

      Treating training as a formality

      Two days of training with written SOPs is the cheapest reliability investment available. Buyers who skip it usually spend the same money later on a service visit to fix problems the manual already described.

      22. Comparing quotations line by line

      Three quotations for the same nominal machine can differ by 40 % and still describe the same hardware, because what sits inside the price is different. The line-by-line comparison below is the one we recommend to buyers, and it is also the format our own proposals follow so that the differences are visible rather than buried in a total.

      What should be inside the base price

      The base price should include the machine as specified, one set of tooling for the agreed format, the control system with its recipe memory, guards and interlocks, an English manual, a tool kit and a spare seal set. If any of those appear as separate lines in a competing quotation, the totals are not comparable and the cheaper number is usually the one with more excluded.

      What should be quoted separately, and why

      Freight, insurance, duties, installation, training beyond the included days, custom tooling and optional inspection equipment should be separate. That is not a trick; it lets you see the cost of each decision. The trick is the opposite: a single lump sum that hides a two-week commissioning visit inside a number you cannot audit.

      Warranty terms

      Compare the duration, what is covered, who pays the freight on a warranty part, and what voids the warranty. Twelve months on parts with buyer-paid freight is very different from twelve months including freight and labour. Ask for the wording, not the summary.

      Payment schedule and risk

      Thirty per cent deposit and seventy per cent against documents is the common structure for export. A supplier asking for the full amount before dispatch is asking you to carry all the risk; a supplier accepting ten per cent deposit is carrying it themselves. The schedule tells you something about who expects to have problems.

      Lead time and its components

      Ask for the split between engineering, procurement, assembly, testing and packing. A lead time of forty days that is thirty days of waiting for a servo drive is a different risk from forty days of assembly. When a date slips, the split tells you whether to push the supplier or the component.

      23. Questions procurement teams ask us most often

      Can you supply the same machine on 415 V, 60 Hz?

      Yes. Voltage, phase and frequency are specified at order because they change the motors, the drives and the transformer sizing. Changing them after the machine is built means replacing components, and it is one of the few specifications that cannot be adjusted on site.

      What is the actual delivery time to our port?

      Production lead time is 25 to 45 days, sea freight to most destinations is 18 to 35 days, and port-to-door adds three to ten days depending on customs. The total is what your planning needs, and it is usually 8 to 12 weeks from order to a machine running in your plant.

      Do you provide a local installation service?

      We send engineers from the factory for installation and commissioning, and for repeat buyers we can arrange a local partner for routine service. Installation by the factory team is the option we recommend for a first machine, because it transfers the process knowledge as well as the hardware.

      What happens if a part fails in the first year?

      Warranty parts ship by air within three working days of a confirmed diagnosis, and we ask for photographs and the fault code so the diagnosis is right the first time. For critical wear items we recommend holding a local kit, which costs a few hundred dollars and removes the air-freight delay entirely.

      Can the machine be audited before we release the balance?

      Yes. The factory acceptance test is the natural point: you or your third-party inspector attend, watch the run, review the calibration data and the material certificates, and the balance is released against a signed report. Buyers who skip this step sometimes discover a specification mismatch only after the container arrives.

      24. Service levels, response times and what we commit to in writing

      Service is the part of a machine purchase that buyers cannot inspect before they pay, which is exactly why it deserves a place in the comparison spreadsheet. What follows is what we put in the contract rather than what we say in a sales meeting, and we recommend asking every competing supplier the same four questions.

      Response time

      First technical response within one working day of a written query with photographs and the fault code. Remote diagnosis within two days. Where a site visit is needed, an engineer is dispatched within five working days, or sooner if the line is stopped.

      Spare parts

      Wear items from stock, shipped within three working days by air. Non-stock parts are quoted with a lead time in writing. The recommended spare kit is listed in the manual with part numbers, so you can reorder from any distributor rather than only from us.

      Warranty

      Twelve months on parts and labour for defects in manufacture, twenty-four months on the frame. Consumables and wear items are excluded, which is normal, but the exclusion list is written down rather than implied. Warranty freight is covered by us for the first shipment of a replacement part.

      Training and knowledge transfer

      Two days of on-site training are included with commissioning: one day for operators covering start-up, changeover, cleaning and the first line of fault finding, and one day for the mechanic covering adjustment, wear inspection and the spare-parts replacement procedure. Both days end with a written SOP that your team keeps.

      What we do not promise

      We do not promise a response time measured in hours, because a promise that cannot be kept is worse than a realistic one. We do not promise that a machine will run at its maximum output indefinitely; we promise the tested output on the format and product used at acceptance, and we document the conditions. Buyers who want a guarantee on through-life output should buy a service contract, and we quote those separately so the cost is visible.

      27. Handover, acceptance and what to verify on site

      Acceptance should be a seal test at your own case sizes, at your line speed, with the tape or glue you intend to buy. Inspect three points on each case: the centre seam, both end seams, and the corner where the tape turns. A seal that fails at the corner will fail in the truck.

      On site, verify that the machine stops when a case jams, that the tape-end sensor works, that the guard on the drive closes the safety circuit, and that the emergency stop is reachable from both sides of the packing station. Tape machines are quiet and easy to reach into while running.

      Ask for the tape or glue specification and the belt pressure setting in writing. A packing line that changes operator every shift drifts back to whatever settings were last used, and the written baseline is what stops the drift.

      Send your container and product details

      Send every case size with length, width and height, the daily volume and the seal method you prefer. We will confirm the frame size, belt type and tape or glue specification, and send a priced proposal with a seal test protocol.

      Request a quotation See the whole Carton sealing range

      We use cookies to improve your experience on our website, analyze traffic, and personalize content. By browsing this website, you agree to our use of cookies. Learn more