Coffee Bag Sealing Machine with Valve Application | SUNAURA

Coffee Bag Sealing Machine with Valve Application | SUNAURA on the SunAura production floor
equipment

Coffee Bag Sealing Machine with Valve Application | SUNAURA

Coffee Bag Sealing Machine with Valve Application | SUNAURA is one of the configurations in the SunAura range. This page is written for buyers comparing options: what this unit does that a cheaper alternative cannot, where its limits sit, and the inputs we need before quoting a firm price.

Outputsee specification
Stationsee specification
Accuracysee specification
Price band (FOB)see specification
Lead time25 – 45 days

Get a specification sheet Jump to RFQ checklist

1. Who this machine is for, and who should not buy it

This page exists for the buyer who has already shortlisted two or three machines and needs to know which one fits a specific production reality. Coffee Bag Sealing Machine with Valve Application | SUNAURA is aimed at plants that run a defined pack format at a steady rate and need a documented, repeatable result rather than a machine that only looks fast on a demonstration video.

It is not the right purchase for every plant. If your output is under a few hundred units an hour on a single format, a semi-automatic unit will do the same job for a third of the money. If your requirement is a new format every week with no changeover time, you need a servo and recipe architecture rather than a mechanical one.

The realistic middle case: one to four pack formats, two to three shifts, an existing line that needs the station to keep pace with machines either side of it. That is the band where the specification on this page is worth the price difference.

2. How it works

The working principle is straightforward to describe and hard to execute well: product is presented to the station, the tooling performs its cycle, the pack leaves. What separates a durable machine from a fragile one is the repeatability of that cycle at the thousandth repetition, and the accessibility of the parts that wear.

Mechanically, the station is built around a welded frame with levelling pads, a guarded drive train, and tooling that is changeable with hand tools. Electrically it runs on a PLC with an HMI that stores recipes, fault codes and a production counter, so a shift supervisor can see what happened without calling an engineer.

In operation the cycle is: infeed present, station home, cycle start, tooling engaged, dwell, release, discharge. Every one of those steps is a place where a badly specified machine loses time, and the specification table below is written so that you can compare those steps across suppliers rather than comparing brochure photographs.

3. Configuration matrix: what changes and what it costs you

The same base frame is sold in several configurations, and the differences matter more than the marketing names suggest. The table below maps each configuration to the buyer profile it actually fits, so you can rule out options before they appear in a quotation.

ConfigurationHeadsTypical outputContainer rangeBest forTrade-off
Standard buildAs quotedsee specificationsee specificationOne or two formats, single shift startMechanical changeover, no recipe memory
Servo variantHigher+25 – 40 % outputsee specificationMultiple formats, frequent changeoverAdds 20 – 35 % to price
Stainless washdownAs quotedsee specificationsee specificationWet or hygienic roomsAdds 8 – 15 % and 5 – 10 days
Line-integratedAs quotedsee specificationsee specificationExisting conveyor and controlsInterface engineering is a separate cost item

Configurations differ in three things: the drive, the surface finish and the control interface. Everything else on this page is common to all builds, which is why a format change usually costs tooling and time rather than a new machine.

4. Technical specifications

Figures below are the standard build. Every value can be changed, but each change moves price, lead time and the commissioning effort, so read the notes column before asking for a variant.

ParameterStandardOptional / rangeWhy it matters
Outputsee specificationUp to the class maximum with servo driveQuoted against a defined pack format
Format rangesee specificationCustom tooling on requestTooling must be fixed at order
Accuracysee specificationTighter with feedback controlDefined on a written test protocol
DriveMechanical cam or servoServo standard on the higher variantsServo is what enables recipe changeover
ControlPLC + HMIRecipe library, fault log, counterAsk how many recipes are stored
Contact material304 stainless316L or food-grade coatingsSet by cleaning regime
GuardingInterlocked guardsSafety relay, dual-channel E-stopCE conformity requires this
Air supply0.6 MPa0.7 MPa, drier air preferredMoisture is the main cause of valve faults
Power380 V three-phase415 V / 440 V / 60 Hz for exportConfirm before order, not after
FootprintPer layout drawingCustom frame on requestService access is part of the footprint
Changeover10 – 30 min mechanicalUnder 5 min with recipe and quick-release toolingMeasured to first good pack
Warranty12 months parts24 months frameWritten terms only

5. Throughput and capacity planning

Output figures are quoted at a defined pack format, and the practical number is always lower than the headline. Plan on 60 to 70 % of the maximum for a realistic shift average, because changeovers, minor stops and material supply interruptions are normal rather than exceptional.

Size the machine for your busiest week rather than your average month, then check that the quieter weeks still justify the capital. If seasonality is strong, look at a smaller frame with a second shift rather than a large frame running at 30 % utilisation for eight months of the year.

A useful test before you commit: take your annual volume, divide by the number of production days, then by the hours per shift. If the answer is within 70 % of the quoted maximum, the machine is correctly sized. If it is within 95 %, you have bought a bottleneck.

Shift patternGross outputOEE at 65%Annual bottles (300 days)
1 × 8 h0 bph0 bph0
2 × 8 h0 bph0 bph0
3 × 8 h0 bph0 bph0

Size the machine on the middle of the range, not the top. A unit sold at 0 bottles per hour that runs at 0 for six hours a day is being asked to live at its mechanical limit; the same unit at 0 bottles per hour has headroom for viscosity drift, cap changes and the occasional slow batch.

6. Product and container fit

Fit is decided by the pack, not by the machine. The same station performs very differently on a 200 ml rigid container and on a flexible pouch, and the difference is visible in the reject rate rather than in the speed.

Before accepting a quotation, ask for the machine to be demonstrated on your pack or a close equivalent. A demonstration on the supplier’s preferred sample proves the machine can work; it does not prove it works on your pack.

Product typeViscosity bandFitWhat to watch
Small rigid packsup to 250 mlUsually goodCheck tooling contact area
Large rigid packs250 ml – 5 LGood with correct toolingWeight affects conveyor and drive sizing
Flexible packspouch, sachet, flow packDepends on filmFilm stiffness decides stability
Irregular shapesnon-standard geometryConditionalCustom tooling and a trial are mandatory
Hot or chilled productabove 60 °C / below 8 °CConditionalMaterial and condensation both matter
Abrasive or corrosivechemical, abrasive fillConditional316L and hardened contact faces

7. Selection decision framework

Use these rules in order. Each one is a hard filter, not a preference, and each is written so that two buyers with different constraints reach different answers rather than the same recommendation.

Rule 1: Output requirement

If your required output is within 70 % of the quoted maximum, this class of machine fits. Above 85 %, step up a size or add a second station; do not plan to run at the limit every shift.

Rule 2: Format count

One or two formats justify a mechanical changeover. Three or more formats a week justify the servo variant purely on labour saved at each changeover.

Rule 3: Pack material

Rigid containers are forgiving. Flexible or irregular packs need a trial with your own material before the tooling is fixed, because tooling changes after order are the most expensive kind.

Rule 4: Cleaning regime

Dry areas can use a powder-coated frame. Washdown areas need stainless and IP65 electrics specified at order; retrofitting costs roughly twice as much.

Rule 5: Utility limits

Check air capacity at shift start, not at lunchtime. A machine that starves for air shows up as random faults that look like control problems.

Rule 6: Growth path

If output may double in two years, ask whether the frame, drive and PLC are sized for the upgrade. A frame ordered too small is a replacement, not an upgrade.

8. Alternatives compared head to head

The honest comparison is not against a competitor’s catalogue but against the three other ways to do the same job. Each has a cost structure that suits a different buyer, and choosing by headline price alone usually means paying again within two years.

CriterionCoffee Bag Sealing Machine with Valve Application | SUNAURAThis configurationSemi-automatic alternativeHigher-speed line machine
Capital costMid30 – 50 % lower60 – 120 % highersee specification
Labour per shift1 operator1 – 2 operators1 operator plus a mechanicsee specification
Changeover10 – 30 min5 min, manualUnder 5 min with recipesee specification
Output ceilingClass maximumAbout halfTwo to three timessee specification
Consistency at hour 8StableOperator dependentStable with servosee specification
Best fitSteady single-format productionLow volume, high mixHigh volume, few formatssee specification

Read across the rows rather than down the columns. The cheap option wins on capital and loses on labour and consistency; the expensive option wins on output and loses on flexibility if your volume never arrives.

9. Line integration

A station is only as good as the line around it. Upstream, the machine needs a steady supply at the right pitch; downstream, it needs a take-away that does not back up. The most common integration fault is a mismatch of 15 to 20 % in speed between adjacent machines, which produces permanent stop-start running.

Agree the interface before shipment: container-present signal, machine-running signal, fault relay, and a common E-stop circuit. Ask for the I/O list with the quotation. Machines that arrive without an agreed interface consume commissioning days that someone has to pay for.

If you are integrating with an existing line, send photographs of the conveyor, the transfer point and the cabinet position. Two photographs usually prevent a redesign that would otherwise be discovered on site.

10. Hygiene, materials and compliance

Product-contact and pack-contact surfaces are 304 stainless as standard, 316L on request, with machined rather than welded surfaces wherever geometry allows. The frame finish depends on your cleaning regime, not on preference.

Documentation is a separate question from material grade. Ask for material certificates, a food-contact declaration where relevant, and a CE declaration with the risk assessment behind it. Auditors ask for the set, not for a single letter.

Cleanability lives in details: removable tooling without tools, draining surfaces with no upward-facing crevices, and guards that can be opened for cleaning without dismantling the station. Specify them at order; they are cheap then and expensive later.

11. Installation and commissioning

StageDurationWho does itDeliverable

Commissioning takes three to eight days for a single station and two to three weeks for a line. The two items that most often slip are the buyer’s power connection and the arrival of production material, so book both before the machine lands.

12. Maintenance, spares and uptime

Maintenance is small and frequent rather than large and rare. Tooling wear parts, seals and belts cause most unplanned stops, and all three are inexpensive. A weekly check of output quality catches wear before it becomes a customer complaint.

Keep a critical spares kit from day one: one set of the wear items, one belt, one sensor. The kit costs a few hundred dollars and removes the two-week air freight that turns a two-hour repair into a fifteen-day stoppage.

Wear partIntervalCost bandDowntime if ignored

13. Cost structure and total cost of ownership

The purchase price is roughly 60 to 70 % of the five-year cost. The rest is freight, installation, spares, utilities and labour. Buyers who compare only FOB prices routinely choose the machine with the higher cost per thousand packs.

A quick sanity check: divide the machine price by the packs it will produce in five years at your real utilisation, then add spares and power. The result is usually within 20 % of the competing quotes, which means the difference is being decided by changeover labour and downtime rather than by price.

Cost lineTypical bandNotes
Machine, FOBsee specificationExcludes freight, duty and installation
Sea freight and insuranceUS$ 700 – 2,400Depends on volume and destination
Installation and commissioningUS$ 1,000 – 2,600Two engineers, 3 – 8 days
TrainingIncludedTwo days on site with written SOPs
Spares, year 1US$ 500 – 1,400Wear items and one sensor set
UtilitiesPer 1,000 packsAir and power at local tariffs

14. RFQ checklist

A quotation is only as precise as the inputs behind it. Buyers who send these fourteen data points in the first email typically receive a firm price and a layout drawing on the first reply; buyers who send “a filling machine, about 5,000 an hour” spend three rounds establishing what that means.

    15. Quality assurance and FAT documentation

    Factory acceptance is where disputes are prevented. We run the station on your pack or a close equivalent, measure the output over a four-hour run and record rejects by cause. If the result is outside the agreed criteria, it is corrected before shipment.

    The documentation pack travels with the machine and is also sent as a PDF before dispatch, so your quality team can review it while the container is at sea.

      16. Frequently asked questions

      What output can I realistically expect?

      Plan on 60 to 70 % of the quoted maximum for a shift average. The headline number assumes ideal packs, no changeovers and continuous material supply, which is true in a demonstration and rarely true in production.

      Can the machine be changed over to another format?

      Yes, with tooling. Mechanical changeover takes 10 to 30 minutes; the servo variant with a recipe and quick-release tooling takes under five. The cost of changeover is labour, and it is the number most buyers underestimate.

      What is the lead time?

      Typically 25 to 45 days from order, depending on configuration and whether custom tooling is involved. Custom tooling adds one to two weeks and should be planned from the start rather than discovered at the end.

      What documentation is supplied?

      Material certificates, electrical drawings, PLC backup, calibration records, a FAT report, a CE declaration and an English operation and maintenance manual with a spare-parts list.

      How is the machine shipped and installed?

      Fumigated wooden case, sea freight, and installation by two engineers over three to eight days including calibration and training. We can quote CIF or FOB, and we recommend CIF for first-time importers.

      Can we see the machine running before we pay the balance?

      Yes. We send a video of the acceptance run and, where practical, arrange a live call during the FAT so your engineer can watch the run and ask questions in real time.

      17. Footprint, utilities and infrastructure

      Site planning fails more often on ceiling height and drain position than on floor area, so check these three numbers before the layout is drawn: the height needed for nozzle lift plus the tallest container, the distance from the machine to the nearest drain, and the free capacity on your compressed-air ring main at shift start, when every other machine is also drawing air.

      ItemRequirementNote
      Floor area2.4 x 1.3 m for the machine, plus 1.2 m service access on each sideAccess is for the mechanic, not for the operator
      Ceiling height1.9 m minimum above the frameNozzle lift plus container height
      Power3 kW, 380 V three-phase, 50 or 60 HzSeparate circuit with earth, not shared with welders
      Compressed air0.6 MPa, 0.4 m3/min free capacityDry air; moisture causes valve sticking
      DrainWithin 1.5 m of the machineFor washdown and for the drip tray outlet
      NoiseUnder 75 dB(A) at 1 mMost of it comes from the vacuum pump or blower, not the filler

      A common mistake is to install the machine against a wall to save floor space. The service access on the left side is where the mechanic reaches the drive and the valve manifold; blocking it turns a fifteen-minute job into a two-hour dismantling job, and in practice it also means the machine is never serviced properly.

      18. Application scenarios by industry

      The same machine is bought for very different reasons, and the configuration that suits one industry is often wrong for another. These four patterns cover most of the enquiries we receive, and each one points to a different set of options.

      Food and beverage producers usually need washdown-capable surfaces, food-contact declarations and a changeover fast enough to run three products in a shift. Their decision is driven by the retailer audit, and the machine is specified with stainless frame, IP65 electrics and removable nozzles. Their biggest hidden cost is not the machine but the changeover labour they did not plan for.

      Cosmetic and personal-care producers fill smaller volumes at lower output, and their constraint is appearance: no drips on the bottle shoulder, no product in the thread, consistent fill line across a batch. They need a back-suction or suck-back nozzle and a slower final approach more than they need speed, and they usually regret buying a machine sized for output rather than for cleanliness.

      Pharmaceutical and diagnostic producers buy documentation as much as hardware. The filling head is secondary to the material traceability, the validation package and the ability to prove that cleaning was effective. Their machine is 316L, their seals are PTFE, and their acceptance test is a written protocol rather than a visual check.

      Chemical and household producers fill corrosive or volatile liquids where the wetted material and the seal elastomer decide the machine life. They need Viton or PTFE seals, a stainless frame, and often an extraction hood over the filling zone. Accuracy is less critical than containment, and the machine should be specified accordingly.

      19. Supplier evaluation: seven questions with answers you should accept

      Buying a filling machine is a comparison between suppliers as much as between machines, and the difference shows up in the second year rather than the first. These seven questions are the ones that separate a supplier who builds machines from one who resells them, and each has an answer you can check against a document.

      1. Can you show the calibration record for every head?

      A serious supplier weighs thirty bottles per head and reports mean and standard deviation per head, not a single number for the machine. If a head is 2 % off while the average looks fine, the record exposes it and the machine should not ship.

      2. What is the spare-part lead time for wear items?

      Nozzle seals and valve seats should be shippable in under a week from stock. If the answer is “we order from the OEM”, your machine stops for two weeks the first time a seal fails, and seals always fail.

      3. Who signs the acceptance test, and against what criteria?

      The criteria should be written before the order, in numbers: output over four hours, volume tolerance, drip count, reject rate. A supplier who will not commit to numbers is telling you the numbers are not stable.

      4. What is the changeover procedure, and who can perform it?

      An operator should be able to change format in under ten minutes with a recipe call and one tool. If the answer involves a mechanic and a spanner, add the labour cost to your five-year total before you compare prices.

      5. Which parts are bought in, and from where?

      Servo drives, PLCs, pneumatic valves and load cells are branded components, and their availability in your region decides whether a breakdown is a two-day or a two-month event. Ask for the brand list and check local distribution before you sign.

      6. What does commissioning include, and what costs extra?

      Installation, calibration, training and a production trial should be itemised. The expensive surprises are usually crane hire, extra engineers beyond the agreed days, and re-commissioning after your utilities turn out to be out of specification.

      7. Can we speak to a customer running the same product?

      A supplier with a real installed base can name two or three references on request. Vague answers here are the single strongest signal to slow down.

      20. The first 90 days after arrival

      The first three months decide whether the machine settles into a rhythm or becomes a source of daily firefighting. Most of what goes wrong in this window is procedural rather than mechanical, and it is fixable if it is watched.

      Days 1 to 10: install, level and align to the conveyor, verify rotation direction and air pressure, then run empty containers through every station by hand before powering the filling circuit. Record the as-built settings in the manual rather than on a note taped to the frame.

      Days 11 to 30: calibrate each head on your own product at your own filling temperature, then run a full shift at 70 % of rated output and log volume every hour. The drift pattern in this shift predicts the maintenance interval better than any manual.

      Days 31 to 60: train a second operator and one mechanic, not just the person who will run the day shift. Single-person knowledge is the most common cause of a line that cannot run at weekends or during holidays.

      Days 61 to 90: review the reject log, count the stops and their causes, and set the first preventive-maintenance dates from the real failure pattern rather than the generic intervals in the manual. Order the first spare kit before the end of this window, because the first seal failure usually arrives around month four.

      21. Specification mistakes that cost buyers money later

      Nearly every unhappy installation traces back to a decision made in the quotation stage, when a number was accepted without being checked. These six mistakes appear often enough to be predictable, and each is cheap to avoid at order and expensive to correct after arrival.

      Accepting output quoted without container details

      A speed quoted in bottles per hour means nothing until it is tied to a fill volume, a neck diameter and a product viscosity. Ask for the test conditions in writing: 500 ml, 28 mm neck, water at 20 °C is a very different machine from 1 L, 18 mm neck, syrup at 12 °C.

      Buying the maximum head count the budget allows

      More heads raise output, but they also raise air consumption, spill risk, calibration work and the cost of every future seal replacement. A machine with eight heads running six days a week at 80 % utilisation beats a twelve-head machine running three days at 45 %.

      Forgetting the conveyor pitch

      The filling machine, the capper and the labeller must share a container pitch and a conveyor height. When they do not, the integrator builds a transfer plate and a pitch change, and the buyer pays for it in commissioning time and in jams that never quite disappear.

      Under-specifying the electricals

      IP65 electrics, a separate earth and a dedicated circuit cost a few hundred dollars at order. Retrofitting them into a running line costs a shutdown, a new cabinet and an electrician, and until it is done the machine is a washdown hazard.

      Buying seals by price

      A seal that costs two dollars less and lasts half as long doubles your maintenance labour and adds a failure mode in the middle of a production run. Specify the elastomer by product compatibility, not by unit cost.

      Treating training as a formality

      Two days of training with written SOPs is the cheapest reliability investment available. Buyers who skip it usually spend the same money later on a service visit to fix problems the manual already described.

      22. Comparing quotations line by line

      Three quotations for the same nominal machine can differ by 40 % and still describe the same hardware, because what sits inside the price is different. The line-by-line comparison below is the one we recommend to buyers, and it is also the format our own proposals follow so that the differences are visible rather than buried in a total.

      What should be inside the base price

      The base price should include the machine as specified, one set of tooling for the agreed format, the control system with its recipe memory, guards and interlocks, an English manual, a tool kit and a spare seal set. If any of those appear as separate lines in a competing quotation, the totals are not comparable and the cheaper number is usually the one with more excluded.

      What should be quoted separately, and why

      Freight, insurance, duties, installation, training beyond the included days, custom tooling and optional inspection equipment should be separate. That is not a trick; it lets you see the cost of each decision. The trick is the opposite: a single lump sum that hides a two-week commissioning visit inside a number you cannot audit.

      Warranty terms

      Compare the duration, what is covered, who pays the freight on a warranty part, and what voids the warranty. Twelve months on parts with buyer-paid freight is very different from twelve months including freight and labour. Ask for the wording, not the summary.

      Payment schedule and risk

      Thirty per cent deposit and seventy per cent against documents is the common structure for export. A supplier asking for the full amount before dispatch is asking you to carry all the risk; a supplier accepting ten per cent deposit is carrying it themselves. The schedule tells you something about who expects to have problems.

      Lead time and its components

      Ask for the split between engineering, procurement, assembly, testing and packing. A lead time of forty days that is thirty days of waiting for a servo drive is a different risk from forty days of assembly. When a date slips, the split tells you whether to push the supplier or the component.

      23. Questions procurement teams ask us most often

      Can you supply the same machine on 415 V, 60 Hz?

      Yes. Voltage, phase and frequency are specified at order because they change the motors, the drives and the transformer sizing. Changing them after the machine is built means replacing components, and it is one of the few specifications that cannot be adjusted on site.

      What is the actual delivery time to our port?

      Production lead time is 25 to 45 days, sea freight to most destinations is 18 to 35 days, and port-to-door adds three to ten days depending on customs. The total is what your planning needs, and it is usually 8 to 12 weeks from order to a machine running in your plant.

      Do you provide a local installation service?

      We send engineers from the factory for installation and commissioning, and for repeat buyers we can arrange a local partner for routine service. Installation by the factory team is the option we recommend for a first machine, because it transfers the process knowledge as well as the hardware.

      What happens if a part fails in the first year?

      Warranty parts ship by air within three working days of a confirmed diagnosis, and we ask for photographs and the fault code so the diagnosis is right the first time. For critical wear items we recommend holding a local kit, which costs a few hundred dollars and removes the air-freight delay entirely.

      Can the machine be audited before we release the balance?

      Yes. The factory acceptance test is the natural point: you or your third-party inspector attend, watch the run, review the calibration data and the material certificates, and the balance is released against a signed report. Buyers who skip this step sometimes discover a specification mismatch only after the container arrives.

      24. Service levels, response times and what we commit to in writing

      Service is the part of a machine purchase that buyers cannot inspect before they pay, which is exactly why it deserves a place in the comparison spreadsheet. What follows is what we put in the contract rather than what we say in a sales meeting, and we recommend asking every competing supplier the same four questions.

      Response time

      First technical response within one working day of a written query with photographs and the fault code. Remote diagnosis within two days. Where a site visit is needed, an engineer is dispatched within five working days, or sooner if the line is stopped.

      Spare parts

      Wear items from stock, shipped within three working days by air. Non-stock parts are quoted with a lead time in writing. The recommended spare kit is listed in the manual with part numbers, so you can reorder from any distributor rather than only from us.

      Warranty

      Twelve months on parts and labour for defects in manufacture, twenty-four months on the frame. Consumables and wear items are excluded, which is normal, but the exclusion list is written down rather than implied. Warranty freight is covered by us for the first shipment of a replacement part.

      Training and knowledge transfer

      Two days of on-site training are included with commissioning: one day for operators covering start-up, changeover, cleaning and the first line of fault finding, and one day for the mechanic covering adjustment, wear inspection and the spare-parts replacement procedure. Both days end with a written SOP that your team keeps.

      What we do not promise

      We do not promise a response time measured in hours, because a promise that cannot be kept is worse than a realistic one. We do not promise that a machine will run at its maximum output indefinitely; we promise the tested output on the format and product used at acceptance, and we document the conditions. Buyers who want a guarantee on through-life output should buy a service contract, and we quote those separately so the cost is visible.

      Send your container and product details

      Send the pack format, material, target output and the machines either side of this station. We will reply with a priced proposal, a layout drawing and the utility schedule within two working days.

      Request a quotation See the whole range

      We use cookies to improve your experience on our website, analyze traffic, and personalize content. By browsing this website, you agree to our use of cookies. Learn more