
High Speed Horizontal Pillow Packaging Line
A compact pillow packing machine for small items and short runs, where floor space and changeover time matter more than maximum output.
| Output | 60 – 120 packs/min |
|---|---|
| Lane | Single lane |
| Accuracy | ± 1 mm cut position |
| Price band (FOB) | US$ 12,000 – 45,000 |
| Lead time | see specification |
1. Who this machine is for, and who should not buy it
This wrapper is bought by producers who need a sealed pillow pack around a discrete product at a speed a hand sealer cannot reach, using heat-sealable film rather than pre-made bags. It suits bakery, confectionery, hardware, medical disposables, cosmetics and household items where the pack is a protective envelope rather than a display carton.
It is the wrong machine for products that need a shaped or gusseted pack, for very heavy items above 5 kg, and for film structures that cannot be heat sealed at the temperature the machine can reach. It is also wrong for a buyer who needs 20 packs a minute on one product, because a semi-automatic L-sealer does that for a fifth of the price.
The realistic buyer is running 60 to 300 packs per minute on one to three product sizes, with film bought on reels, and with a downstream cartoner or case packer that needs a steady stream rather than bursts.
2. How it works
The product is fed onto the infeed conveyor at a fixed pitch. A forming shoulder turns a flat film into a tube around the product, the longitudinal sealer closes the tube, and the end-seal jaws cut and seal the pack. The film is pulled by the jaw motion, so the pack length is set by the film feed length rather than by the product length.
The three variables that decide quality are sealing temperature, jaw pressure and dwell. Too little heat gives a weak seal that opens in transit; too much burns through the film and leaves a hole that a leak test will find. The window between them is narrow for thin films and wider for laminated structures.
Servo-driven machines control film feed and jaw motion independently, which is what allows a recipe change between product sizes without mechanical adjustment. Mechanical machines achieve the same result with a change gear and a cam, at a lower price and a longer changeover.
3. Configuration matrix: what changes and what it costs you
The same base frame is sold in several configurations, and the differences matter more than the marketing names suggest. The table below maps each configuration to the buyer profile it actually fits, so you can rule out options before they appear in a quotation.
| Configuration | Heads | Typical output | Container range | Best for | Trade-off |
|---|---|---|---|---|---|
| Mechanical, single knife | 1 | 60 – 120 packs/min | Product up to 250 mm | One product size, steady demand | Changeover with tools, 30 – 60 min |
| Servo, single knife | 1 | 120 – 200 packs/min | Product 40 – 300 mm | Two or three sizes, frequent change | Adds 25 – 40 % to price |
| Servo, rotary jaws | 1 | 200 – 300 packs/min | Product up to 200 mm | High volume, small products | Film quality must be consistent |
| Servo with gas flush | 1 | 120 – 200 packs/min | Product up to 300 mm | Modified atmosphere packs | Gas system is a separate cost |
The knife type is the decision most buyers underestimate. A single fixed knife is fine for one product and becomes a bottleneck at three; rotary jaws are fast but demand a film that tolerates a very short dwell.
4. Technical specifications
Figures below are the standard build. Every value can be changed, but each change moves price, lead time and the commissioning effort, so read the notes column before asking for a variant.
| Parameter | Standard | Optional / range | Why it matters |
|---|---|---|---|
| Pack speed | 60 – 120 packs/min | Up to 300 packs/min with rotary jaws | Quoted on a defined product |
| Product size | Length 40 – 350 mm | Width and height per tooling | Tooling fixed at order |
| Film width | Up to 500 mm | Wider with custom forming shoulder | Film width sets the pack girth |
| Film types | OPP, CPP, PE, laminates | Down to 20 µm on servo machines | Thin film needs precise temperature |
| Sealing | Heat seal, jaw dwell 0.2 – 1.0 s | Impulse or ultrasonic on request | Dwell must match film structure |
| Cut | Single knife | Rotary or zig-zag | Zig-zag helps tear-open |
| Control | PLC + HMI | Recipe memory, fault log | Recipe count grows with SKU count |
| Air supply | 0.6 MPa, 0.3 m³/min | 0.7 MPa | Drives jaw and knife |
| Power | 3 – 5 kW | Up to 7 kW with gas flush | 380 V three-phase |
| Frame | Powder-coated steel | Stainless for washdown | Hygiene rooms need stainless |
| Guarding | Interlocked guards | CE safety circuit | Jaw area is the primary hazard |
| Changeover | 30 – 60 min mechanical | Under 10 min servo with recipe | Measured to first good pack |
5. Throughput and capacity planning
Output depends on pack length and film feed, not on the number printed on the brochure. A machine rated at 200 packs per minute at 80 mm pack length runs about 120 at 150 mm, because each pack consumes proportionally more film and more jaw cycle time.
Plan on 65 to 75 % of the maximum for a shift average. The losses come from film splices, temperature recovery after a stop, product gaps on the infeed and changeovers.
If your product range includes both a small item and a large one, check the film width range before buying. A machine sized for the large product wastes film and runs slower on the small one, and the film cost difference usually exceeds the machine price difference within two years.
| Shift pattern | Gross output | OEE at 65% | Annual bottles (300 days) |
|---|---|---|---|
| 1 × 8 h | 120 bph | 78 bph | 187,200 |
| 2 × 8 h | 120 bph | 78 bph | 374,400 |
| 3 × 8 h | 120 bph | 78 bph | 561,600 |
Size the machine on the middle of the range, not the top. A unit sold at 120 bottles per hour that runs at 120 for six hours a day is being asked to live at its mechanical limit; the same unit at 90 bottles per hour has headroom for viscosity drift, cap changes and the occasional slow batch.
6. Product and container fit
Fit is decided by product shape and film. A regular, rigid product wraps cleanly; a soft or irregular product shifts on the infeed and produces packs with folded ends that fail the seal test.
Film structure matters as much as thickness. A laminated film with a defined seal layer tolerates a wider temperature window than a mono-layer film, and it is the difference between a stable line and one that needs constant adjustment.
| Product type | Viscosity band | Fit | What to watch |
|---|---|---|---|
| Bakery and confectionery | soft, irregular | Good with a shaped infeed | Product must not deform under jaw pressure |
| Hardware and small parts | rigid, regular | Excellent | Sharp edges can puncture thin film |
| Medical disposables | flat, light | Excellent | Clean room builds available |
| Cosmetics and household | regular shapes | Good | Label placement must be planned |
| Fresh produce | variable size | Conditional | Weight variation changes pack tension |
| Very heavy items | above 5 kg | Not suitable | Use a different wrapping principle |
7. Selection decision framework
Use these rules in order. Each one is a hard filter, not a preference, and each is written so that two buyers with different constraints reach different answers rather than the same recommendation.
Rule 1: Pack length drives everything
Above 250 mm the cycle time dominates and the machine speed falls away. If your product is long, look at a machine with a longer jaw stroke rather than a higher headline speed.
Rule 2: Film structure decides the seal window
Send us the film specification before quoting. A 20 µm mono-layer runs on a different temperature profile from a 45 µm laminate, and the wrong profile shows up as leaks rather than as visible defects.
Rule 3: Product stability decides the infeed
If the product can roll or shift, the infeed needs flighted lugs or a shaped pocket. Buying the wrapper without the infeed is the most common cause of a line that runs at half its rated speed.
Rule 4: Changeover frequency decides the drive
One product size justifies a mechanical machine. Three sizes a week justify servo on labour alone, before any speed benefit is counted.
Rule 5: Downstream speed decides the buffer
A cartoner that runs at 80 packs per minute behind a wrapper at 200 needs an accumulation conveyor, otherwise the wrapper stops and starts and the seal quality varies with every restart.
Rule 6: Gas flush is a separate decision
Modified atmosphere adds a gas system, a film with a barrier layer and a leak test. If you need shelf life beyond a few weeks, plan it at order; retrofitting a gas system costs more than the original option.
8. Alternatives compared head to head
The wrapper competes with three other ways to make the same pack, and the choice is usually decided by pack shape rather than by speed.
| Criterion | High Speed Horizontal Pillow Packaging Line | Pillow / flow wrapper | Pre-made pouch lines | Shrink wrapping |
|---|---|---|---|---|
| Pack form | Pillow, sealed both ends | Stand-up or flat pouch | Shrink film bundle | see specification |
| Film cost | Low per pack | Higher, pre-made | Low to medium | see specification |
| Speed | 60 – 300 packs/min | 30 – 120 packs/min | 20 – 60 packs/min | see specification |
| Changeover | 10 – 60 min | 5 – 15 min | 15 – 30 min | see specification |
| Shelf appeal | Basic | High, printed pouch | Medium | see specification |
| Best fit | Protective envelope, high speed | Retail presentation | Multipacks and trays | see specification |
Pre-made pouches win on shelf appeal and lose on film cost and speed. Shrink wrapping wins on multipack economics and loses on single-item presentation. The pillow pack is the cheapest protective pack per unit, which is why it dominates for hardware, bakery and disposables.
9. Line integration
Upstream, the wrapper needs a metered infeed. Hand feeding caps the line at about 40 packs per minute regardless of machine speed, so a feeding conveyor or a multi-lane distributor is part of the decision, not an accessory.
Downstream, the pack leaves at a fixed pitch and can go straight to a cartoner, a labeller or a case packer. If a labeller follows, allow space for the pack to cool, because a hot seal that passes under a label roller deforms.
Signals to agree: product-present, film-end warning, jaw fault, and a pack-count output for the downstream counter. A film splice without a warning produces a run of empty packs, which is a quality problem traced back to the wrapper even when the cause is the film reel.
10. Hygiene, materials and compliance
Contact surfaces are stainless on food builds; the film path is designed to be cleaned without dismantling the jaws. Washdown builds add IP65 electrics and a sloping frame.
Food-contact documentation covers the film path and the infeed, and the film itself carries its own declaration from its supplier. Auditors usually ask for both, and the machine certificate alone is not enough.
If the product is exposed, specify a stainless infeed and guards that can be removed for cleaning without tools. On bakery lines this is the difference between a ten-minute clean-down and a forty-minute one.
11. Installation and commissioning
| Stage | Duration | Who does it | Deliverable |
|---|
Commissioning takes three to six days including film trials. The film trial is the step that most often extends the schedule, because the correct temperature and dwell are found by running your film, not by using the settings from the manual.
12. Maintenance, spares and uptime
Jaws, knives and the forming shoulder are the wear items. A jaw that has lost its flatness produces seals that look correct and fail a leak test, so check flatness monthly with a straight edge.
Keep spare jaw inserts, one knife and a forming shoulder for your main product size. These are the parts that stop the line, and they are inexpensive relative to the downtime.
| Wear part | Interval | Cost band | Downtime if ignored |
|---|---|---|---|
| Jaw inserts | 6 – 12 months | US$ 60 – 200 per set | Partial seals, leaks |
| Knife blade | 6 – 12 months | US$ 40 – 120 | Ragged cut, film jams |
| Forming shoulder | 24 months | US$ 200 – 500 | Film wrinkling, off-centre packs |
| Teflon tape | 3 – 6 months | US$ 15 – 40 | Film sticking to the jaw |
13. Cost structure and total cost of ownership
Film is the dominant cost over five years, not the machine. A wrapper that wastes 8 % of film because the width is oversized costs more than the price difference between a properly sized machine and a larger one.
Calculate film cost per pack before comparing machines: film width × pack length × price per square metre. A machine that runs 15 % faster but wastes 10 % film is usually the more expensive choice.
| Cost line | Typical band | Notes |
|---|---|---|
| Machine, FOB | US$ 12,000 – 45,000 | Depends on drive and jaw type |
| Film | US$ 0.01 – 0.06 per pack | Dominant five-year cost |
| Power | US$ 0.20 – 0.60 per 1,000 packs | Heaters dominate |
| Spares, year 1 | US$ 400 – 1,000 | Jaws, knife, tape |
| Changeover labour | 30 – 60 min per change | Mechanical machines only |
| Freight and install | US$ 900 – 2,600 | Two engineers, 3 – 6 days |
14. RFQ checklist
A quotation is only as precise as the inputs behind it. Buyers who send these fourteen data points in the first email typically receive a firm price and a layout drawing on the first reply; buyers who send "a filling machine, about 5,000 an hour" spend three rounds establishing what that means.
15. Quality assurance and FAT documentation
Factory acceptance runs your film on your product or a dummy of the same size and weight, then checks seal strength by peeling a sample and by a leak test where the product allows. The report records the temperature, dwell and pressure used.
Ask for the settings to be written into the manual for your film, not left to be rediscovered at commissioning. Buyers who receive a machine without recorded settings spend the first week tuning by trial.
16. Frequently asked questions
What film can the machine run?
Heat-sealable films from 20 to 60 µm: OPP, CPP, PE, PET laminates and most barrier structures. Send the specification and we will confirm the temperature range and the jaw coating needed.
How do I set the right sealing temperature?
Start 10 °C below the film supplier's recommendation, seal a sample, peel it and increase in 5 °C steps until the bond is complete without thinning at the seal edge. Record the final value per film.
What pack length range can it handle?
40 to 350 mm depending on the jaw stroke and the tooling. Pack length is set by film feed, so the range is a mechanical limit rather than a programming one.
Why do packs leak at the end seal?
Usually product contamination in the seal area, insufficient jaw pressure, or a jaw that is no longer flat. Product in the seal is the most common cause and is solved by an infeed that positions the product consistently.
Can it run in a modified atmosphere?
Yes, with the gas flush option and a barrier film. The gas system, the film and the leak test are three separate decisions and should be planned together.
What is the realistic output on a 150 mm pack?
About 120 packs per minute on a servo machine rated at 200 at 80 mm. Film feed length, not the headline number, decides the real speed.
17. Footprint, utilities and infrastructure
Site planning fails more often on ceiling height and drain position than on floor area, so check these three numbers before the layout is drawn: the height needed for nozzle lift plus the tallest container, the distance from the machine to the nearest drain, and the free capacity on your compressed-air ring main at shift start, when every other machine is also drawing air.
| Item | Requirement | Note |
|---|---|---|
| Floor area | 2.4 x 1.3 m for the machine, plus 1.2 m service access on each side | Access is for the mechanic, not for the operator |
| Ceiling height | 1.9 m minimum above the frame | Nozzle lift plus container height |
| Power | 3 kW, 380 V three-phase, 50 or 60 Hz | Separate circuit with earth, not shared with welders |
| Compressed air | 0.6 MPa, 0.4 m3/min free capacity | Dry air; moisture causes valve sticking |
| Drain | Within 1.5 m of the machine | For washdown and for the drip tray outlet |
| Noise | Under 75 dB(A) at 1 m | Most of it comes from the vacuum pump or blower, not the filler |
A common mistake is to install the machine against a wall to save floor space. The service access on the left side is where the mechanic reaches the drive and the valve manifold; blocking it turns a fifteen-minute job into a two-hour dismantling job, and in practice it also means the machine is never serviced properly.
18. Application scenarios by industry
The same machine is bought for very different reasons, and the configuration that suits one industry is often wrong for another. These four patterns cover most of the enquiries we receive, and each one points to a different set of options.
Food and beverage producers usually need washdown-capable surfaces, food-contact declarations and a changeover fast enough to run three products in a shift. Their decision is driven by the retailer audit, and the machine is specified with stainless frame, IP65 electrics and removable nozzles. Their biggest hidden cost is not the machine but the changeover labour they did not plan for.
Cosmetic and personal-care producers fill smaller volumes at lower output, and their constraint is appearance: no drips on the bottle shoulder, no product in the thread, consistent fill line across a batch. They need a back-suction or suck-back nozzle and a slower final approach more than they need speed, and they usually regret buying a machine sized for output rather than for cleanliness.
Pharmaceutical and diagnostic producers buy documentation as much as hardware. The filling head is secondary to the material traceability, the validation package and the ability to prove that cleaning was effective. Their machine is 316L, their seals are PTFE, and their acceptance test is a written protocol rather than a visual check.
Chemical and household producers fill corrosive or volatile liquids where the wetted material and the seal elastomer decide the machine life. They need Viton or PTFE seals, a stainless frame, and often an extraction hood over the filling zone. Accuracy is less critical than containment, and the machine should be specified accordingly.
19. Supplier evaluation: seven questions with answers you should accept
Buying a filling machine is a comparison between suppliers as much as between machines, and the difference shows up in the second year rather than the first. These seven questions are the ones that separate a supplier who builds machines from one who resells them, and each has an answer you can check against a document.
1. Can you show the calibration record for every head?
A serious supplier weighs thirty bottles per head and reports mean and standard deviation per head, not a single number for the machine. If a head is 2 % off while the average looks fine, the record exposes it and the machine should not ship.
2. What is the spare-part lead time for wear items?
Nozzle seals and valve seats should be shippable in under a week from stock. If the answer is "we order from the OEM", your machine stops for two weeks the first time a seal fails, and seals always fail.
3. Who signs the acceptance test, and against what criteria?
The criteria should be written before the order, in numbers: output over four hours, volume tolerance, drip count, reject rate. A supplier who will not commit to numbers is telling you the numbers are not stable.
4. What is the changeover procedure, and who can perform it?
An operator should be able to change format in under ten minutes with a recipe call and one tool. If the answer involves a mechanic and a spanner, add the labour cost to your five-year total before you compare prices.
5. Which parts are bought in, and from where?
Servo drives, PLCs, pneumatic valves and load cells are branded components, and their availability in your region decides whether a breakdown is a two-day or a two-month event. Ask for the brand list and check local distribution before you sign.
6. What does commissioning include, and what costs extra?
Installation, calibration, training and a production trial should be itemised. The expensive surprises are usually crane hire, extra engineers beyond the agreed days, and re-commissioning after your utilities turn out to be out of specification.
7. Can we speak to a customer running the same product?
A supplier with a real installed base can name two or three references on request. Vague answers here are the single strongest signal to slow down.
20. The first 90 days after arrival
The first three months decide whether the machine settles into a rhythm or becomes a source of daily firefighting. Most of what goes wrong in this window is procedural rather than mechanical, and it is fixable if it is watched.
Days 1 to 10: install, level and align to the conveyor, verify rotation direction and air pressure, then run empty containers through every station by hand before powering the filling circuit. Record the as-built settings in the manual rather than on a note taped to the frame.
Days 11 to 30: calibrate each head on your own product at your own filling temperature, then run a full shift at 70 % of rated output and log volume every hour. The drift pattern in this shift predicts the maintenance interval better than any manual.
Days 31 to 60: train a second operator and one mechanic, not just the person who will run the day shift. Single-person knowledge is the most common cause of a line that cannot run at weekends or during holidays.
Days 61 to 90: review the reject log, count the stops and their causes, and set the first preventive-maintenance dates from the real failure pattern rather than the generic intervals in the manual. Order the first spare kit before the end of this window, because the first seal failure usually arrives around month four.
21. Specification mistakes that cost buyers money later
Nearly every unhappy installation traces back to a decision made in the quotation stage, when a number was accepted without being checked. These six mistakes appear often enough to be predictable, and each is cheap to avoid at order and expensive to correct after arrival.
Accepting output quoted without container details
A speed quoted in bottles per hour means nothing until it is tied to a fill volume, a neck diameter and a product viscosity. Ask for the test conditions in writing: 500 ml, 28 mm neck, water at 20 °C is a very different machine from 1 L, 18 mm neck, syrup at 12 °C.
Buying the maximum head count the budget allows
More heads raise output, but they also raise air consumption, spill risk, calibration work and the cost of every future seal replacement. A machine with eight heads running six days a week at 80 % utilisation beats a twelve-head machine running three days at 45 %.
Forgetting the conveyor pitch
The filling machine, the capper and the labeller must share a container pitch and a conveyor height. When they do not, the integrator builds a transfer plate and a pitch change, and the buyer pays for it in commissioning time and in jams that never quite disappear.
Under-specifying the electricals
IP65 electrics, a separate earth and a dedicated circuit cost a few hundred dollars at order. Retrofitting them into a running line costs a shutdown, a new cabinet and an electrician, and until it is done the machine is a washdown hazard.
Buying seals by price
A seal that costs two dollars less and lasts half as long doubles your maintenance labour and adds a failure mode in the middle of a production run. Specify the elastomer by product compatibility, not by unit cost.
Treating training as a formality
Two days of training with written SOPs is the cheapest reliability investment available. Buyers who skip it usually spend the same money later on a service visit to fix problems the manual already described.
22. Comparing quotations line by line
Three quotations for the same nominal machine can differ by 40 % and still describe the same hardware, because what sits inside the price is different. The line-by-line comparison below is the one we recommend to buyers, and it is also the format our own proposals follow so that the differences are visible rather than buried in a total.
What should be inside the base price
The base price should include the machine as specified, one set of tooling for the agreed format, the control system with its recipe memory, guards and interlocks, an English manual, a tool kit and a spare seal set. If any of those appear as separate lines in a competing quotation, the totals are not comparable and the cheaper number is usually the one with more excluded.
What should be quoted separately, and why
Freight, insurance, duties, installation, training beyond the included days, custom tooling and optional inspection equipment should be separate. That is not a trick; it lets you see the cost of each decision. The trick is the opposite: a single lump sum that hides a two-week commissioning visit inside a number you cannot audit.
Warranty terms
Compare the duration, what is covered, who pays the freight on a warranty part, and what voids the warranty. Twelve months on parts with buyer-paid freight is very different from twelve months including freight and labour. Ask for the wording, not the summary.
Payment schedule and risk
Thirty per cent deposit and seventy per cent against documents is the common structure for export. A supplier asking for the full amount before dispatch is asking you to carry all the risk; a supplier accepting ten per cent deposit is carrying it themselves. The schedule tells you something about who expects to have problems.
Lead time and its components
Ask for the split between engineering, procurement, assembly, testing and packing. A lead time of forty days that is thirty days of waiting for a servo drive is a different risk from forty days of assembly. When a date slips, the split tells you whether to push the supplier or the component.
23. Questions procurement teams ask us most often
Can you supply the same machine on 415 V, 60 Hz?
Yes. Voltage, phase and frequency are specified at order because they change the motors, the drives and the transformer sizing. Changing them after the machine is built means replacing components, and it is one of the few specifications that cannot be adjusted on site.
What is the actual delivery time to our port?
Production lead time is 25 to 45 days, sea freight to most destinations is 18 to 35 days, and port-to-door adds three to ten days depending on customs. The total is what your planning needs, and it is usually 8 to 12 weeks from order to a machine running in your plant.
Do you provide a local installation service?
We send engineers from the factory for installation and commissioning, and for repeat buyers we can arrange a local partner for routine service. Installation by the factory team is the option we recommend for a first machine, because it transfers the process knowledge as well as the hardware.
What happens if a part fails in the first year?
Warranty parts ship by air within three working days of a confirmed diagnosis, and we ask for photographs and the fault code so the diagnosis is right the first time. For critical wear items we recommend holding a local kit, which costs a few hundred dollars and removes the air-freight delay entirely.
Can the machine be audited before we release the balance?
Yes. The factory acceptance test is the natural point: you or your third-party inspector attend, watch the run, review the calibration data and the material certificates, and the balance is released against a signed report. Buyers who skip this step sometimes discover a specification mismatch only after the container arrives.
24. Service levels, response times and what we commit to in writing
Service is the part of a machine purchase that buyers cannot inspect before they pay, which is exactly why it deserves a place in the comparison spreadsheet. What follows is what we put in the contract rather than what we say in a sales meeting, and we recommend asking every competing supplier the same four questions.
Response time
First technical response within one working day of a written query with photographs and the fault code. Remote diagnosis within two days. Where a site visit is needed, an engineer is dispatched within five working days, or sooner if the line is stopped.
Spare parts
Wear items from stock, shipped within three working days by air. Non-stock parts are quoted with a lead time in writing. The recommended spare kit is listed in the manual with part numbers, so you can reorder from any distributor rather than only from us.
Warranty
Twelve months on parts and labour for defects in manufacture, twenty-four months on the frame. Consumables and wear items are excluded, which is normal, but the exclusion list is written down rather than implied. Warranty freight is covered by us for the first shipment of a replacement part.
Training and knowledge transfer
Two days of on-site training are included with commissioning: one day for operators covering start-up, changeover, cleaning and the first line of fault finding, and one day for the mechanic covering adjustment, wear inspection and the spare-parts replacement procedure. Both days end with a written SOP that your team keeps.
What we do not promise
We do not promise a response time measured in hours, because a promise that cannot be kept is worse than a realistic one. We do not promise that a machine will run at its maximum output indefinitely; we promise the tested output on the format and product used at acceptance, and we document the conditions. Buyers who want a guarantee on through-life output should buy a service contract, and we quote those separately so the cost is visible.
Send your container and product details
Send the product dimensions, weight, film specification and target output. We will confirm the jaw type, the film width and the tooling, and send a priced proposal with a film trial protocol.
Request a quotation See the whole Pillow / flow wrapping range
