SUNAURA MACHINERY

18-Head Multihead Weigher

Home › Products › 18-Head Multihead Weigher
Multihead combination weigher with hoppers
Multihead weighing equipment

18-Head Multihead Weigher

An 18-head combination weigher for portions between 20 g and 2 kg, where the extra heads over a 14-head unit buy accuracy on small targets and speed on large ones.

Output80 – 110 portions/min
Heads14 – 24 hoppers
Accuracy± 0.5 – 1 g
Price band (FOB)US$ 28,000 – 75,000
Lead timesee specification

Get a specification sheet Jump to RFQ checklist

1. Who this machine is for, and who should not buy it

This weigher is bought by producers packing free-flowing solids into fixed-weight portions, where a volumetric filler cannot hold the tolerance and a single-head scale is too slow. It suits snacks, frozen food, hardware, granular chemicals, seeds and pet food.

It is the wrong machine for sticky or wet products that bridge in the hoppers, for very large portions above 5 kg, and for powders that fluidise. Those cases need a different feeding principle, and a combination weigher will disappoint regardless of how it is set up.

The realistic buyer runs 40 to 120 portions per minute on two to eight products, with portion weights between 20 g and 2 kg, and with a bagger or a tray sealer downstream that needs a consistent portion rather than an average.

2. How it works

Product is fed to a dispersion cone, spread across radial feeders, and dropped into weigh hoppers. Each hopper's weight is read continuously; the controller computes combinations that hit the target weight within tolerance and picks the fastest one, then discharges those hoppers together into the bagger.

The mathematics is why accuracy improves with more heads. With 14 heads there are thousands of possible combinations; with 24 there are millions. The controller does not need the best combination, only one within tolerance, which is why more heads means both faster and more accurate.

What limits real performance is feed consistency, not head count. A weigher fed in surges spends its time waiting, and a weigher fed with a variable product density produces a target weight that is correct and a portion count that is wrong.

3. Configuration matrix: what changes and what it costs you

The same base frame is sold in several configurations, and the differences matter more than the marketing names suggest. The table below maps each configuration to the buyer profile it actually fits, so you can rule out options before they appear in a quotation.

ConfigurationHeadsTypical outputContainer rangeBest forTrade-off
10 head1040 – 60 portions/min20 g – 1 kgSmall bags, low volumeLimited combinations, slower target hit
14 head1460 – 90 portions/min20 g – 2 kgGeneral food packingThe usual starting point
18 head1880 – 110 portions/min20 g – 5 kgHigh accuracy, high speedNeeds more floor space
24 head24100 – 140 portions/min10 g – 3 kgSmall portions at high speedHighest price, most maintenance

Head count is the main price driver, and the point of diminishing return arrives earlier than most buyers expect: going from 14 to 18 heads adds about 25 % to throughput, and from 18 to 24 adds about 15 % for a similar price increment.

4. Technical specifications

Figures below are the standard build. Every value can be changed, but each change moves price, lead time and the commissioning effort, so read the notes column before asking for a variant.

ParameterStandardOptional / rangeWhy it matters
Weighing heads14 – 24CustomHead count sets speed and accuracy
Portion range10 g – 5 kgPer hopper sizeHopper size fixed at order
Accuracy± 0.5 – 1 g± 0.2 g on small portionsDepends on product flow
Speed80 – 110 portions/minUp to 140 portions/minAt optimum feed
Weighing methodLoad cells, digitalStrain gauge or electromagneticElectromagnetic is faster
ControlPLC + touch screenRecipe memory, statisticsStatistics are the diagnostic tool
FeedVibratory radial feedersBelt feed for fragile productsFragile products need belt feed
DischargeTimed chuteIntermittent or continuousMust match the bagger cycle
Product contact304 stainless316L, food-gradeSet by product corrosivity
Air supply0.6 MPa, 0.4 m³/min0.7 MPaDrives hopper gates
Power2 – 4 kWUp to 6 kW380 V three-phase
Footprint1,600 – 2,200 mm diameterPlatform or frame mountedCheck ceiling for feed height

5. Throughput and capacity planning

Output is portions per minute, and it depends on how quickly the controller finds a combination within tolerance. At 14 heads with a 500 g portion, 80 portions per minute is realistic; the same machine on a 50 g portion reaches about 100, because smaller portions have more valid combinations.

Plan on 80 to 90 % of the quoted speed. The losses come from feed interruptions, bagger stops and product changes that require re-tuning the feeders.

If your bagger runs at a fixed 70 portions per minute, buying a 110-portion weigher does not make the line faster. Match the weigher to the bagger, then add 20 % headroom for product variation.

Shift patternGross outputOEE at 65%Annual bottles (300 days)
1 × 8 h110 bph72 bph171,600
2 × 8 h110 bph72 bph343,200
3 × 8 h110 bph72 bph514,800

Size the machine on the middle of the range, not the top. A unit sold at 110 bottles per hour that runs at 110 for six hours a day is being asked to live at its mechanical limit; the same unit at 83 bottles per hour has headroom for viscosity drift, cap changes and the occasional slow batch.

6. Product and container fit

Fit is decided by how the product flows. Dry, free-flowing granules and pieces weigh accurately and quickly; sticky, wet or irregular pieces bridge in the hoppers and produce weight drift that no controller setting can fix.

Piece size relative to portion weight matters too. A portion of 20 pieces has a natural weight variation of a few percent; a portion of 3 pieces has a variation that no weigher can remove, because the granularity of the product is the limit.

Product typeViscosity bandFitWhat to watch
Snacks and biscuitsdry, regularExcellentBreakage needs belt feed
Frozen vegetableswet, frozenGoodIce build-up on hoppers
Hardware and fastenersdry, irregularExcellentSharp edges wear hoppers
Granular chemicalsdry, free-flowingExcellentDust needs extraction
Sticky or wet productsadhesiveNot suitableBridging in feeders and hoppers
Fine powdersfluidisingNot suitableUse auger or vacuum filling

7. Selection decision framework

Use these rules in order. Each one is a hard filter, not a preference, and each is written so that two buyers with different constraints reach different answers rather than the same recommendation.

Rule 1: Portion weight first

Below 50 g you need small hoppers and more heads; above 1 kg you need larger hoppers and fewer heads. Buying large hoppers for a small portion costs accuracy, because the resolution of the load cell is a fraction of its range.

Rule 2: Product behaviour second

Free-flowing products work on vibratory feeders. Fragile or sticky products need belt feed or a different principle entirely. Ask for a trial with your product before the order.

Rule 3: Head count third

Match the weigher to the bagger speed plus 20 %, not to the maximum available. Extra heads cost money and maintenance and buy nothing if the downstream machine is the limit.

Rule 4: Accuracy target fourth

A target of ± 1 g on a 500 g portion is easy; ± 0.5 g on a 50 g portion needs 18 heads or more and a stable feed. Define the target before comparing prices.

Rule 5: Interface fifth

The discharge must match the bagger cycle. A weigher that discharges on its own timing produces double fills and empty bags, which are usually blamed on the bagger.

Rule 6: Hygiene sixth

Dust-generating products need extraction and a stainless contact path. Specify at order; retrofitting extraction into a weigher is a rebuild.

8. Alternatives compared head to head

The weigher competes with volumetric filling and with single-head weighing, and the choice is decided by how tight the weight tolerance has to be.

Criterion18-Head Multihead WeigherMultihead combination weigherVolumetric cup fillerSingle-head check-weigher
Accuracy± 0.5 – 1 g± 3 – 8 %± 1 – 2 g per portionsee specification
Speed60 – 140 portions/min40 – 100 portions/min20 – 40 portions/minsee specification
Product rangeFree-flowing solidsUniform granules onlyAny, but slowsee specification
Changeover2 – 5 min by recipeTooling changeRecipe changesee specification
PriceUS$ 28,000 – 75,000US$ 8,000 – 20,000US$ 6,000 – 15,000see specification
Best fitFixed weight, legal toleranceLow-cost uniform productSmall volume, verificationsee specification

Volumetric filling is cheap and fast and cannot hold a weight tolerance on a product with variable bulk density. A single-head check-weigher verifies but does not speed anything up. The combination weigher is the only one of the three that improves both accuracy and speed.

9. Line integration

The weigher sits between the product feed and the bagger. Upstream, a stable feed is essential: an elevator or a conveyor that delivers a consistent layer of product keeps the feeders full without surging.

Downstream, the bagger or tray sealer must accept the discharge timing. Where the bagger has a fixed cycle, the weigher controller must be set to match it, otherwise portions queue and the discharge chute jams.

Signals worth agreeing: weigher-ready, discharge-complete, bagger-ready, fault relay and a reject output for out-of-tolerance portions. Without a reject output, overweight portions reach the case and the average weight runs high, which costs money on every pack.

10. Hygiene, materials and compliance

Product-contact hoppers and chutes are 304 stainless, 316L on request, with food-grade liners on the feed pans. Dust-generating products need extraction at the feed and at the discharge.

Documentation covers material certificates and the food-contact declaration, plus a calibration record for each load cell. Auditors ask for the calibration record more often than for the material certificates.

Cleaning between products is the practical hygiene issue: hoppers that cannot be removed without tools turn a twenty-minute change into a two-hour one. Specify quick-release hoppers if you run multiple products.

11. Installation and commissioning

StageDurationWho does itDeliverable

Commissioning takes three to five days including a product trial and feeder tuning. Feeder tuning is the step that decides the real speed, and it needs your product, not a sample of similar bulk density.

12. Maintenance, spares and uptime

Load cells, hopper gates and feed pans are the wear items. A drifting load cell produces a weight bias that looks like a product problem, so a weekly check with a calibration weight is the cheapest diagnostic available.

Keep one spare load cell and a set of hopper gate seals. A load-cell failure without a spare typically stops the line for a week, and the part itself is a few hundred dollars.

Wear partIntervalCost bandDowntime if ignored
Load cell24 – 36 monthsUS$ 200 – 600Weight bias, reject spikes
Hopper gate seal12 monthsUS$ 20 – 60Product leakage, weight drift
Feed pan12 – 24 monthsUS$ 60 – 180Inconsistent feed
Discharge chute liner12 monthsUS$ 40 – 120Sticking, jammed portions

13. Cost structure and total cost of ownership

The weigher is a capital item with modest running costs: power, air, occasional load cells and the labour to keep it tuned. The real cost of a badly specified weigher is giveaway — product given away because portions run over the target weight.

Giveaway is easy to quantify: a 2 % average overweight on a 500 g portion at 100 portions per minute is about one tonne of product per 100 hours. At most product values that exceeds the annual maintenance cost.

Cost lineTypical bandNotes
Machine, FOBUS$ 28,000 – 75,000Head count drives price
Giveaway0.5 – 3 % of productReduced by more heads and better feed
Power and airUS$ 0.6 – 1.4 per hourCompressors dominate
Spares, year 1US$ 500 – 1,500Load cell, seals, pans
Calibration labour30 min per weekWith a certified test weight
Freight and installUS$ 1,200 – 3,000Platform mounting may be needed

14. RFQ checklist

A quotation is only as precise as the inputs behind it. Buyers who send these fourteen data points in the first email typically receive a firm price and a layout drawing on the first reply; buyers who send "a filling machine, about 5,000 an hour" spend three rounds establishing what that means.

    15. Quality assurance and FAT documentation

    Factory acceptance runs your product or a matched substitute, weighs 50 consecutive portions on a certified scale and reports the mean, the standard deviation and the giveaway percentage. Those three numbers are the acceptance criteria.

    Ask for the feeder settings and the recipe to be recorded in the manual, because the correct settings are product-specific and cannot be derived from the machine specification.

      16. Frequently asked questions

      How many heads do I need?

      Match the weigher to your bagger speed plus about 20 %. For 60 portions per minute, 14 heads is ample. Above 100, 18 or 24 heads earn their price.

      What accuracy is realistic?

      ± 0.5 to 1 g on portions above 100 g, and ± 0.2 to 0.5 g on smaller portions with more heads. The limit is often the piece weight, not the machine.

      Will it handle sticky products?

      Usually not. Sticky products bridge in the feeders and hoppers. If your product is tacky, a different filling principle is the right answer.

      What is giveaway and how do I reduce it?

      Giveaway is the product you give away because portions run above target. More heads, a stable feed and a target weight set at the mean rather than the maximum all reduce it.

      Can it integrate with our existing bagger?

      Yes, provided the discharge timing can be matched. Send the bagger model and cycle time, and we will confirm the interface before quoting.

      What maintenance does it need?

      Weekly calibration check, monthly hopper cleaning, annual seal replacement. Load cells are the main component that fails with age.

      17. Footprint, utilities and infrastructure

      Site planning fails more often on ceiling height and drain position than on floor area, so check these three numbers before the layout is drawn: the height needed for nozzle lift plus the tallest container, the distance from the machine to the nearest drain, and the free capacity on your compressed-air ring main at shift start, when every other machine is also drawing air.

      ItemRequirementNote
      Floor area2.4 x 1.3 m for the machine, plus 1.2 m service access on each sideAccess is for the mechanic, not for the operator
      Ceiling height1.9 m minimum above the frameNozzle lift plus container height
      Power3 kW, 380 V three-phase, 50 or 60 HzSeparate circuit with earth, not shared with welders
      Compressed air0.6 MPa, 0.4 m3/min free capacityDry air; moisture causes valve sticking
      DrainWithin 1.5 m of the machineFor washdown and for the drip tray outlet
      NoiseUnder 75 dB(A) at 1 mMost of it comes from the vacuum pump or blower, not the filler

      A common mistake is to install the machine against a wall to save floor space. The service access on the left side is where the mechanic reaches the drive and the valve manifold; blocking it turns a fifteen-minute job into a two-hour dismantling job, and in practice it also means the machine is never serviced properly.

      18. Application scenarios by industry

      The same machine is bought for very different reasons, and the configuration that suits one industry is often wrong for another. These four patterns cover most of the enquiries we receive, and each one points to a different set of options.

      Food and beverage producers usually need washdown-capable surfaces, food-contact declarations and a changeover fast enough to run three products in a shift. Their decision is driven by the retailer audit, and the machine is specified with stainless frame, IP65 electrics and removable nozzles. Their biggest hidden cost is not the machine but the changeover labour they did not plan for.

      Cosmetic and personal-care producers fill smaller volumes at lower output, and their constraint is appearance: no drips on the bottle shoulder, no product in the thread, consistent fill line across a batch. They need a back-suction or suck-back nozzle and a slower final approach more than they need speed, and they usually regret buying a machine sized for output rather than for cleanliness.

      Pharmaceutical and diagnostic producers buy documentation as much as hardware. The filling head is secondary to the material traceability, the validation package and the ability to prove that cleaning was effective. Their machine is 316L, their seals are PTFE, and their acceptance test is a written protocol rather than a visual check.

      Chemical and household producers fill corrosive or volatile liquids where the wetted material and the seal elastomer decide the machine life. They need Viton or PTFE seals, a stainless frame, and often an extraction hood over the filling zone. Accuracy is less critical than containment, and the machine should be specified accordingly.

      19. Supplier evaluation: seven questions with answers you should accept

      Buying a filling machine is a comparison between suppliers as much as between machines, and the difference shows up in the second year rather than the first. These seven questions are the ones that separate a supplier who builds machines from one who resells them, and each has an answer you can check against a document.

      1. Can you show the calibration record for every head?

      A serious supplier weighs thirty bottles per head and reports mean and standard deviation per head, not a single number for the machine. If a head is 2 % off while the average looks fine, the record exposes it and the machine should not ship.

      2. What is the spare-part lead time for wear items?

      Nozzle seals and valve seats should be shippable in under a week from stock. If the answer is "we order from the OEM", your machine stops for two weeks the first time a seal fails, and seals always fail.

      3. Who signs the acceptance test, and against what criteria?

      The criteria should be written before the order, in numbers: output over four hours, volume tolerance, drip count, reject rate. A supplier who will not commit to numbers is telling you the numbers are not stable.

      4. What is the changeover procedure, and who can perform it?

      An operator should be able to change format in under ten minutes with a recipe call and one tool. If the answer involves a mechanic and a spanner, add the labour cost to your five-year total before you compare prices.

      5. Which parts are bought in, and from where?

      Servo drives, PLCs, pneumatic valves and load cells are branded components, and their availability in your region decides whether a breakdown is a two-day or a two-month event. Ask for the brand list and check local distribution before you sign.

      6. What does commissioning include, and what costs extra?

      Installation, calibration, training and a production trial should be itemised. The expensive surprises are usually crane hire, extra engineers beyond the agreed days, and re-commissioning after your utilities turn out to be out of specification.

      7. Can we speak to a customer running the same product?

      A supplier with a real installed base can name two or three references on request. Vague answers here are the single strongest signal to slow down.

      20. The first 90 days after arrival

      The first three months decide whether the machine settles into a rhythm or becomes a source of daily firefighting. Most of what goes wrong in this window is procedural rather than mechanical, and it is fixable if it is watched.

      Days 1 to 10: install, level and align to the conveyor, verify rotation direction and air pressure, then run empty containers through every station by hand before powering the filling circuit. Record the as-built settings in the manual rather than on a note taped to the frame.

      Days 11 to 30: calibrate each head on your own product at your own filling temperature, then run a full shift at 70 % of rated output and log volume every hour. The drift pattern in this shift predicts the maintenance interval better than any manual.

      Days 31 to 60: train a second operator and one mechanic, not just the person who will run the day shift. Single-person knowledge is the most common cause of a line that cannot run at weekends or during holidays.

      Days 61 to 90: review the reject log, count the stops and their causes, and set the first preventive-maintenance dates from the real failure pattern rather than the generic intervals in the manual. Order the first spare kit before the end of this window, because the first seal failure usually arrives around month four.

      21. Specification mistakes that cost buyers money later

      Nearly every unhappy installation traces back to a decision made in the quotation stage, when a number was accepted without being checked. These six mistakes appear often enough to be predictable, and each is cheap to avoid at order and expensive to correct after arrival.

      Accepting output quoted without container details

      A speed quoted in bottles per hour means nothing until it is tied to a fill volume, a neck diameter and a product viscosity. Ask for the test conditions in writing: 500 ml, 28 mm neck, water at 20 °C is a very different machine from 1 L, 18 mm neck, syrup at 12 °C.

      Buying the maximum head count the budget allows

      More heads raise output, but they also raise air consumption, spill risk, calibration work and the cost of every future seal replacement. A machine with eight heads running six days a week at 80 % utilisation beats a twelve-head machine running three days at 45 %.

      Forgetting the conveyor pitch

      The filling machine, the capper and the labeller must share a container pitch and a conveyor height. When they do not, the integrator builds a transfer plate and a pitch change, and the buyer pays for it in commissioning time and in jams that never quite disappear.

      Under-specifying the electricals

      IP65 electrics, a separate earth and a dedicated circuit cost a few hundred dollars at order. Retrofitting them into a running line costs a shutdown, a new cabinet and an electrician, and until it is done the machine is a washdown hazard.

      Buying seals by price

      A seal that costs two dollars less and lasts half as long doubles your maintenance labour and adds a failure mode in the middle of a production run. Specify the elastomer by product compatibility, not by unit cost.

      Treating training as a formality

      Two days of training with written SOPs is the cheapest reliability investment available. Buyers who skip it usually spend the same money later on a service visit to fix problems the manual already described.

      22. Comparing quotations line by line

      Three quotations for the same nominal machine can differ by 40 % and still describe the same hardware, because what sits inside the price is different. The line-by-line comparison below is the one we recommend to buyers, and it is also the format our own proposals follow so that the differences are visible rather than buried in a total.

      What should be inside the base price

      The base price should include the machine as specified, one set of tooling for the agreed format, the control system with its recipe memory, guards and interlocks, an English manual, a tool kit and a spare seal set. If any of those appear as separate lines in a competing quotation, the totals are not comparable and the cheaper number is usually the one with more excluded.

      What should be quoted separately, and why

      Freight, insurance, duties, installation, training beyond the included days, custom tooling and optional inspection equipment should be separate. That is not a trick; it lets you see the cost of each decision. The trick is the opposite: a single lump sum that hides a two-week commissioning visit inside a number you cannot audit.

      Warranty terms

      Compare the duration, what is covered, who pays the freight on a warranty part, and what voids the warranty. Twelve months on parts with buyer-paid freight is very different from twelve months including freight and labour. Ask for the wording, not the summary.

      Payment schedule and risk

      Thirty per cent deposit and seventy per cent against documents is the common structure for export. A supplier asking for the full amount before dispatch is asking you to carry all the risk; a supplier accepting ten per cent deposit is carrying it themselves. The schedule tells you something about who expects to have problems.

      Lead time and its components

      Ask for the split between engineering, procurement, assembly, testing and packing. A lead time of forty days that is thirty days of waiting for a servo drive is a different risk from forty days of assembly. When a date slips, the split tells you whether to push the supplier or the component.

      23. Questions procurement teams ask us most often

      Can you supply the same machine on 415 V, 60 Hz?

      Yes. Voltage, phase and frequency are specified at order because they change the motors, the drives and the transformer sizing. Changing them after the machine is built means replacing components, and it is one of the few specifications that cannot be adjusted on site.

      What is the actual delivery time to our port?

      Production lead time is 25 to 45 days, sea freight to most destinations is 18 to 35 days, and port-to-door adds three to ten days depending on customs. The total is what your planning needs, and it is usually 8 to 12 weeks from order to a machine running in your plant.

      Do you provide a local installation service?

      We send engineers from the factory for installation and commissioning, and for repeat buyers we can arrange a local partner for routine service. Installation by the factory team is the option we recommend for a first machine, because it transfers the process knowledge as well as the hardware.

      What happens if a part fails in the first year?

      Warranty parts ship by air within three working days of a confirmed diagnosis, and we ask for photographs and the fault code so the diagnosis is right the first time. For critical wear items we recommend holding a local kit, which costs a few hundred dollars and removes the air-freight delay entirely.

      Can the machine be audited before we release the balance?

      Yes. The factory acceptance test is the natural point: you or your third-party inspector attend, watch the run, review the calibration data and the material certificates, and the balance is released against a signed report. Buyers who skip this step sometimes discover a specification mismatch only after the container arrives.

      24. Service levels, response times and what we commit to in writing

      Service is the part of a machine purchase that buyers cannot inspect before they pay, which is exactly why it deserves a place in the comparison spreadsheet. What follows is what we put in the contract rather than what we say in a sales meeting, and we recommend asking every competing supplier the same four questions.

      Response time

      First technical response within one working day of a written query with photographs and the fault code. Remote diagnosis within two days. Where a site visit is needed, an engineer is dispatched within five working days, or sooner if the line is stopped.

      Spare parts

      Wear items from stock, shipped within three working days by air. Non-stock parts are quoted with a lead time in writing. The recommended spare kit is listed in the manual with part numbers, so you can reorder from any distributor rather than only from us.

      Warranty

      Twelve months on parts and labour for defects in manufacture, twenty-four months on the frame. Consumables and wear items are excluded, which is normal, but the exclusion list is written down rather than implied. Warranty freight is covered by us for the first shipment of a replacement part.

      Training and knowledge transfer

      Two days of on-site training are included with commissioning: one day for operators covering start-up, changeover, cleaning and the first line of fault finding, and one day for the mechanic covering adjustment, wear inspection and the spare-parts replacement procedure. Both days end with a written SOP that your team keeps.

      What we do not promise

      We do not promise a response time measured in hours, because a promise that cannot be kept is worse than a realistic one. We do not promise that a machine will run at its maximum output indefinitely; we promise the tested output on the format and product used at acceptance, and we document the conditions. Buyers who want a guarantee on through-life output should buy a service contract, and we quote those separately so the cost is visible.

      One more planning note that rarely appears in quotations: the weigher needs a stable product head above the feeders. If your elevator delivers in batches rather than in a continuous layer, the feeders alternate between starving and overflowing, and the controller spends its time waiting for a valid combination instead of discharging. That is the difference between a machine running at its rated speed and one running at 70 % of it, and it is solved upstream, not in the weighing software.

      Finally, treat the portion weight tolerance as a legal number rather than an engineering one. Most markets enforce an average-weight rule with a maximum permissible negative deviation on individual packs, and a weigher set to hit the target exactly will fail that rule on the underweight side about half the time. Set the target slightly above the declared weight, then measure giveaway monthly and adjust; that is the only way to be both compliant and economic.

      Send your container and product details

      Send the product, portion weight, target speed and the downstream bagger model. We will confirm the head count, hopper size and feeder type, and send a priced proposal with a giveaway test protocol.

      Request a quotation See the whole Multihead weighing range

      Related Articles & Guides

      How to Configure an End-of-Line Carton Packing Line: Sizing the Erector, Conveyor and Case Sealer From a Real Brazil Project

      How to Configure an End-of-Line Carton Packing Line: Sizing the Erector, Conveyor and Case Sealer From a Real Brazil Project…

      Read More →

      Two Automatic Case Packing Lines for a Brazil Customer: From Flat Blank to Sealed Carton, Tested in Our Workshop Before Crating

      Two Automatic Case Packing Lines for a Brazil Customer: From Flat Blank to Sealed Carton, Tested in Our Workshop Before…

      Read More →

      Robotic Palletizer Troubleshooting and Changeover: Dropped Cases, Skewed Layers, Vacuum and Gripper Faults, with a Preventive Maintenance Schedule

      Robotic Palletizer Troubleshooting: Faults, Causes and Fixes Before the Line Stops A robotic palletizer spends its working life repeating the…

      Read More →
      We use cookies to improve your experience on our website, analyze traffic, and personalize content. By browsing this website, you agree to our use of cookies. Learn more